Night work on Hana Highway in Kahului for pavement resurfacing beginning March 2

Posted on Feb 28, 2020 in Highways News, Main, News

KAHULUI – The Hawaii Department of Transportation (HDOT) advises Maui motorists of nightly closures of Hana Highway (Route 36) in Kahului between Kaahumanu Avenue and Dairy Road beginning Monday, March 2, 2020.

One direction at a time of Hana Highway will be closed from 9 p.m. to 5 a.m. between Monday evening, March 2 and Saturday morning, March 7. The night work will involve pavement milling and resurfacing of Hana Highway. This is not a full road closure. The remaining open lanes will be contraflowed to allow single lane traffic in both directions.

All roadwork is weather permitting. Should the scheduled work be canceled or modified, notice will be posted via HDOT’s social media accounts and website.

https://www.facebook.com/HawaiiDepartmentOfTransportation
https://twitter.com/DOTHawaii
https://hidot.hawaii.gov

HDOT thanks the public for their patience and advises motorists to drive with caution and expect delays on the scheduled work nights.

Northbound closure, Southbound contraflow

 

Southbound closure, Northbound contraflow