2011-2014 (+2) STIP Revision #8

The STIP has been modified by STIP Revision #8 to address the immediate need to make funding changes to the County of Maui’s Federal Highways (FHWA) program. This revision will address the need to accelerate the project development schedule for MC39 – Lahaina Watershed Flood Control Project, Phase 3A of the Federal Highways program in Federal fiscal year 2012. $80,000 for design will be federalized for this purpose. These changes were under the Major Revision (Amendment) threshold. This revision has been adopted on September 6, 2012.

Revision #8 has been processed as a Pre-Approved Administrative Modification. Administrative Modifications include cosmetic and minor changes to the scope, schedule or cost estimate of an existing STIP project.

See the attached file for information on revision types:
STIP Revision Definitions (pdf file 34 KB)

Attached is the entire 11-14(+2) STIP as modified by REVISION #8 (pdf file 329 KB)

Note: This Revision did not include any Oahu changes and thus, did not require a revision of the Oahu 11-14(+2) Transportation Improvement Program (TIP). This Revision also did not include any Federal Transit Administration (FTA) changes.

New project information and a list of explanations of the changes reflected in this revision can be found in the following file. The file sorts projects first by project type, then by STIP project number. Changes are noted in red text.

Revision #8 Summary of Changes (pdf file 486KB)

 

Hard copies of the proposed STIP may be obtained by calling (808) 587-6355, or by using the contact information below.

Highway Planning Branch
869 Punchbowl Street, Room 301
Honolulu, Hawaii 96813
email: [email protected]
fax: (808) 587-1787

Follow the STIP on Twitter and Facebook at:
https://twitter.com/HISTIPnews
https://www.facebook.com/stip.hawaii