Upcoming Transportation Projects
Safe Routes for All (proposed)
Below is a list of potential projects if we receive the additional $50M in state funding.
Mamalahoa Highway Naalehu Fill in gaps in sidewalks along Mamalahoa Highway through Naalehu town (approximately Ohai Road to Kaalaiki Road) $240,000
Kuhio Highway at Ehiku Street (Lihue) Complete sidewalk gap on Kuhio Hwy and install crosswalk across Ehiku Street near Walmart $247,000
Ala Moana Boulevard at Ward Avenue intersection Reduce the curb radii at SE corner to reduce pedestrian crossing distance and lower vehicle speeds around right turn $260,000
Kuhio Highway between Aku Road and Hanalei Dolphin Center Construct shared use path along Kuhio Highway through Hanalei Town Center $375,000
Haleakala Highway, Kula Highway near Makawao Construct shared use path/sidewalk along Kula Highway and Haleakala Highway between Aapueo Parkway and Makawao Avenue $440,000
Farrington Highway at Molokai High School Construct dedicated pedestrian facility from Kalae Highway to Molokai High School for children to walk/bike to school $465,000
Mokulele Highway and Puunene Avenue Fill pedestrian gaps with shared use path $525,000
Akoni Pule Highway at Kawaihae Road Realign Akoni Pule Highway to improve sight distance for drivers and pedestrians at Akoni Pule Highway and Kawaihae Harbor Road intersection; install crosswalks and advanced pedestrian warning signs $598,000
Kuhio Highway at Kawaihau Road intersection Construct access to/from the communities along Cane Haul Road, Hauaala Road, and Kawaihau Road in Kapaa to/from the shared use path on the makai side of Kuhio Hwy $3,005,000
Old Keaʻau-Pāhoa Rd – Shoulder Bikeway from Volcano Highway to Keaʻau-Pāhoa Road $13,262
Volcano Highway – Shoulder Bikeway from Kanoelehua to Keaʻau-Pāhoa Road $53,580
Bayfront Highway – Bike Lane from Pauahi Street to Waianuenue Avenue $100,977
Fort Weaver Road (Ewa Beach) – Buffered Bike Lane from Keoneula Boulevard to Kilaha Street $139,761
Queen Ka’ahumanu Highway – Shoulder Bikeway (signing) from Palani Road to junction Akoni Pule Highway & Kawaihae Road $148,375
Volcano Highway (Mamalahoa Highway) – Shoulder Bikeway from Keaau-Pahoa Road to Hawaiʻi Volcanoes National Park $251,413
Mokapu Saddle Road – Bike Lane/Buffered Kapaʻa Quarry Road to N Kalaheo Avenue $302,985
North-South Road (Kualakaʻi Parkway) – Bike Lane from Farrington Highway to Kapolei Parkway $376,436
Old Waiʻalae Road – Bike Lane from Waiʻalae Avenue to South King Street (over H-1) $459,068
Airport Road – Bike Lane from Kanoelehua to Hilo Airport $464,169
Queen Kaahumanu (ext) – Shoulder Bikeway from Kuakini Highwwy/Lako Street to Henry Street $526,398
Kalae Highway – Shoulder Bikeway from Farrington Avenue to Palaʻau State Park $569,244
Kea’au-Pahoa Road – Shoulder Bikeway from Paradise Drive to Kahakai Boulevard $583,527
Fort Weaver Road – Bike Lane from Farrington Highway to Keoneula Boulevard $693,703
Fort Weaver Road Path (Southern section) – Shared Use Path from Kilaha Street to end of public road (Puʻuloa Beach Park) $832,566
Mokapu Saddle Road – Bike Lane/Buffered from Kāneʻohe Bay Drive to N Kalaheo Avenue $893,652
Puʻuloa Road – Protected Bike Lane Salt Lake Boulevard to Nimitz Higway $912,015
Vineyard Boulevard – Bike Lane from Palama Street to Punchbowl Street $1,062,997
Kealakehe Parkway – Path from Queen Kaʻahumanu Highway to Keanalehu Drive $1,074,219
Kamehameha Highway – Shoulder Bikeway from Koʻolau View Drive to Pali Highway $1,145,630
Likelike Highway – Shoulder Bikeway Kahekili Highway to Kamehameha Highway $1,199,697
Kamehameha Highway at Waiawa – New Bike Lane/Bridge from Kamehameha Highway to Kamehameha Highway $1,284,370
Puainako Street – Path from Komohana to Kilauea Street $1,443,461
Kamehameha Highway – Shoulder Bikeway from Waipio Uka Boulevard/CORP to Connector to Waipahu Street $1,552,670
Waiaka Bridge – Shoulder Bikeway from junction Kohala Mountain Road & Kawaihae Road $1,975,012
Wilikina Drive – Shoulder Bikeway from Kunia Road to Kamehameha Highway, Central Oʻahu $2,560,578
Liliha Street – Bike Lane from King Street to H-1 $2,589,142
Kuakini Highway – Shoulder Bikeway from King Kamehameha III Road to Lako Street $2,628,928
Kāneʻohe Bay Drive – Shoulder Bikeway from Kamehameha Highway to Mokapu Saddle Road $2,830,918
Kaumualiʻi Highway – Path (Waimea Town) from Ala Wai Road to Waimea Athletic Field $2,927,442
Kamehameha Highway – Shoulder Bikeway from Kuahelani Avenue to Meheula Parkway $2,970,679
Puʻunēnē Avenue – Bike Lane from Kaʻahumanu Avenue to Dairy Road $3,152,266
Puʻuloa Road – Path from Salt Lake Boulevard to Mahiole Street $3,290,069
Future Kealakehe Pkwy extension – Bike Lane from Kealakaa Street to Palani Road $3,292,026
Airports Projects
FFY |
Category |
Project Title |
Project No. |
Project Description |
Estimated Project Cost |
Project Funding |
Anticipated Bid Opening Date |
2022 |
1 – Safety/Security |
Perimeter Fence Replacement, KOA |
AH2050-09 |
This project includes replacement of approximately 15,880 linear feet of AOA perimeter fencing and posts along the west and north sides of runway 17-35. This project also includes replacement of 14 AOA access gates at various locations along the AOA perimeter fence that are in need of replacement due to corrosion or damage. A new security fence and 3 vehicle access gates will also be installed around the primary switchgear and emergency generator buildings. |
$ 2,972,139.00 |
AIP Supplemental Discretionary Grant No.
3-15-0008-050-2022
($2,222,222) |
Bids Opened 4/14/2022 |
2022 |
2 – Regulatory/ Compliance |
Rwy and Twy Shoulder Rehabilitation, HNL |
AO1021-28 |
This project includes reconstructing various runway and taxiway shoulders at Daniel K. Inouye International Airport. The shoulders included are: Runway 4R-22L, Runway 4L-22R, portions of Taxiway B, Taxiway C, Taxiway D, Taxiway E, Taxiway F, and Taxiway P. The project will also remove excess pavement in order to comply with FAA design criteria for Taxiway Shoulder dimensions, and increase safety by eliminating excess pavement which may be confusing to a pilot when navigating the airfield. Grading in the infields will also be required due to the reconstruction of the shoulders, which corrects non-confirming grades. |
$ 120,010,064.00 |
AIP Entitlement
Grant No. 3-15-0005-143-2022
($23,901,984)BIL AIG
Grant No. 3-15-0005-144-2022
($49,277,050) |
Bids Opened 4/14/2022 |
2022 |
2 – Regulatory/ Compliance |
Repave Runway 17-35 and Taxiway E |
AM2021-20 |
This project includes pavement rehabilitation of Runway 17-35 by milling and overlaying, conducting crack repairs and seal coating to Taxiway E, improvements to Taxiway D that will connect Taxiway E to the Runway 17 end, and drainage improvements through grading and installation of trench drains and underground stormwater management devices adjacent to Runway 17-35. |
$ 16,631,799.00 |
AIP Entitlement
Grant No. 3-15-0011-025-2022
($13,660,000) |
Bids Opened 6/10/2021 |
2022 |
3 – Major Replacement |
Ewa & DH Concourse 2nd & 3rd Level Roadway Improvements, Phase 1, HNL |
AO1043-32 |
This project will include concrete reconstruction, expansion joint replacement, drainage improvements, lighting improvements, and other related improvements on the 2nd and 3rd level roadways fronting the Ewa and Diamond Head Concourses. |
$ 24,039,621.00 |
BIL ATP
Grant No. 3-15-0005-146-2023
($10,000,000) |
Bids Opened 11/3/2022 |
2022 |
5 – Functional Improvement |
Renovation of Airport Control Tower, JRF |
AO5024-03 |
This project includes various renovations to the interior spaces in the Airport Traffic Control Tower at Kalaeloa Airport. |
$ 2,473,840.00 |
BIL FCT
($1,000,000)
Application Submitted 1/6/23 |
Bids Opened 11/30/2022 |
2023 |
1 – Safety/Security |
Taxiway and Runway Lighting Replacement (Taxiway Scope), ITO |
AH1021-19 |
This project includes the replacement of all taxiway lighting fixtures with medium intensity taxiway edge lights (MITLs) using LEDs. A new counterpoise/lightning protection system willl be installed throughout the airfield. |
$ 13,547,884.00 |
AIP Entitlement
Application Submitted 1/6/23 |
Bids Opened 6/9/2022 |
2023 |
1 – Safety/Security |
Fire Alarm System Improvements, KOA |
AH2076-13 |
This project will include replacing obsolete fire alarm control panels, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices to meet current code requirements throughout the Terminal and Maintenance Building. |
$ 3,812,900.00 |
BIL ATP
Application Submitted 12/22/22 |
Apr-23 |
2023 |
2 – Regulatory/ Compliance |
Rwy and Twy Shoulder Rehabilitation, HNL |
AO1021-28 |
This project includes reconstructing various runway and taxiway shoulders at Daniel K. Inouye International Airport. The shoulders included are: Runway 4R-22L, Runway 4L-22R, portions of Taxiway B, Taxiway C, Taxiway D, Taxiway E, Taxiway F, and Taxiway P. The project will also remove excess pavement in order to comply with FAA design criteria for Taxiway Shoulder dimensions, and increase safety by eliminating excess pavement which may be confusing to a pilot when navigating the airfield. Grading in the infields will also be required due to the reconstruction of the shoulders, which corrects non-confirming grades. |
$ 120,010,064.00 |
AIP Entitlement |
Bids Opened 4/14/2022 |
2023 |
2 – Regulatory/ Compliance |
Drainage & Wind Cone Improvements, ITO |
AH1021-20 |
This project includes drainage improvements at the Hawaii Air National Guard Ramp, at Taxiway J, and at various locations along the vehicle service road to address ponding issues that were identified in previous Part 139 inspections. Construction will generally consist of pavement removal, grading, turf restoration, installation of five (5) dry well structures, and management and removal of contaminated soils. This project will also remove and replace three (3) existing windcones for Runway 8, Runway 26, and Runway 21, which are currently located within the ROFA. |
$ 8,961,341.00 |
AIP Entitlement
Application Submitted 12/23/22 |
Bids Opened 1/20/2023 |
2023 |
2 – Regulatory/ Compliance |
Runway 3-21 RSA Improvements & Airfield Lighting Replacement (Phases 0-3), LIH |
AK1031-14 |
This project will include construction phases 0 through 3 of the Runway 3-21 RSA Improvements and Airfield Lighting Replacement. The work will include construction of new runway and taxiway pavements for the relocation of Runway 3-21 to the west to meet FAA RSA standards. It will also displace the threshold of Runway 21. Other work will include the construction of new taxiway pavement to extend the parallel taxiway A with a new connector to the Runway 3 end, construction of retaining walls, relocation/upgrades of navigational and visual aids, runway/taxiway lights, airfield signage, airfield markings, and replacement of the existing airfield lighting systems. |
$ 77,509,325.00 |
BIL AIG
Application Submitted 12/23/22 |
Apr-23 |
2024 |
1 – Safety/Security |
Fire Sprinkler Upgrade, HNL |
AO1096-14 |
This project will include modernization of the existing fire sprinkler system and other fire protection devices at the HNL Overseas Terminal. Fire protection system deficiencies and code compliance issues will be addressed. |
$ 13,198,000.00 |
BIL ATP |
Jan-24 |
2024 |
1 – Safety/Security |
Fire Alarm System Improvements, ITO |
AH1t24-01 |
This project will include replacing obsolete fire alarm control panels, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices to meet current code requirements throughout the Terminal and Maintenance Building. |
$ 2,000,000.00 |
CDS Earmark
Application Submitted 2/24/2023 |
Sep-23 |
2024 |
1 – Safety/Security |
Fire Alarm System Improvements, OGG |
AM1t24-03 |
This project will include replacing obsolete fire alarm control panels, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices to meet current code requirements throughout the Terminal, Maintenance Building, and ARFF Station. |
$ 2,000,000.00 |
CDS Earmark
Application Submitted 2/24/2023 |
Sep-23 |
2024 |
1 – Safety/Security |
Taxiway and Runway Lighting Replacement (Runway Scope), ITO |
AH1021-19 |
This project includes the replacement of Runway 8-26 and Runway 3-21 edge lighting with high intesity runway edge lights (HIRLs) using LEDs. A new counterpoise/lightning protection system will be installed throughout the airfield. |
$ 12,355,916.00 |
AIP Entitlement |
Bids opened 6/9/2022 |
2024 |
1 – Safety/Security |
Terminal Fire Sprinkler Improvements, ITO |
AH1090-03 |
This project will include replacing all existing fire sprinkler systems such as piping replacement and modification, sprinkler head change out, relocation of valve stations, etc. |
$ 2,200,000.00 |
BIL ATP |
Apr-24 |
2024 |
2 – Regulatory/ Compliance |
Apron Light Replacement, OGG |
AS1037-12 |
This project will include replacement of high-pressure sodium high mast lights illuminating the passenger and cargo terminal apron, taxiway, and aircraft parking service areas at Kahului Airport (OGG) with full cut-off light (LED) fixtures to primarily minimize the impacts to seabird “fallout”. In compliance with the Maui County Habitat Conservation Plan and HRS Section 201-8.5 Night Sky Protection strategy, this project will mitigate nighttime lighting impacts to rare, threatened, and/or endangered species. |
$ 27,300,000.00 |
AIP Supplemental Discretionary
Application Submitted 1/27/23 |
May-24 |
2024 |
2 – Regulatory/ Compliance |
Apron Light Replacement, LNY |
AS1037-12 |
This project will include replacement of high-pressure sodium high mast lights illuminating the passenger and cargo terminal apron, taxiway, and aircraft parking service areas at Lanai Airport (LNY) with full cut-off light (LED) fixtures to primarily minimize the impacts to seabird “fallout”. In compliance with the Maui County Habitat Conservation Plan and HRS Section 201-8.5 Night Sky Protection strategy, this project will mitigate nighttime lighting impacts to rare, threatened, and/or endangered species. |
$ 11,700,000.00 |
AIP Supplemental Discretionary
Application Submitted 1/26/23 |
May-24 |
2024
2025 |
2 – Regulatory/ Compliance |
Runway 17-35 Rehabilitation, KOA |
AH2021-16 |
This project will include rehabilitating the entire length of Runway 17-35 (11,000′ x 150′) via a combination of pavement reconstruction, overlay, and mill and replace which will address the pavement distresses as well as bring the runway profile and cross section into compliance with FAA design criteria. |
$ 100,432,000.00 |
AIP Entitlement, BIL AIG |
Sep-23 |
2024 |
2 – Regulatory/ Compliance |
Runway 3-21 RSA Improvements & Airfield Lighting Replacement (Phase 4), LIH |
AK1031-14 |
This project will include construction phase 4 of the Runway 3-21 RSA Improvements and Airfield Lighting Replacement. The work will include Rwy 3 end pavement grooving, Rwy 3-21 pavement markings, Rwy 21 grading, flight checks, and instrument approach procedures. |
$ 6,555,014.00 |
AIP Supplemental Discretionary
Application Submitted 1/26/23 |
Apr-23 |
2024 |
3 – Major Replacement |
Ewa & DH Concourse 2nd & 3rd Level Roadway Improvements, Phase 2, HNL |
AO1043-33 |
This project will include concrete reconstruction, expansion joint replacement, drainage improvements, lighting improvements, and other related improvements on the 2nd and 3rd level roadways fronting the Ewa and Diamond Head Concourses. |
$ 75,000,000.00 |
BIL ATP |
Mar-24 |
2024 |
5 – Functional Improvement |
South TSA Checkpoint, OGG |
AM1095-10 |
This project will include construction of a new security screening checkpoint facility at the south end of the ticket lobby, construction of a new pedestrian bridge over the existing vehicle service road to connect the new checkpoint facility to Holdroom A, enclosure and air conditioning of the existing TSA checkpoint, and improvements to the existing Group Departure canopy adjacent to the new checkpoint. |
$ 62,322,158.00 |
AIP Supplemental Discretionary
Application Submitted 1/26/23CDS Earmark
Application Submitted 2/24/23BIL ATP |
Aug-23 |
2025 |
1 – Safety/Security |
Runway Rehabilitation and Airfield Utility System Improvements |
AO5a25-01 |
This project will include pavement rehabilitation for Runway 11-29, Runway 4R-22L, and Runway 4L-22R. This project will also include replacement and upgrades to the airfield utility system, including the edge lighting, NAVAIDs, and ALCMS. |
$ 17,000,000.00 |
BIL AIG |
Sep-24 |
2025 |
1 – Safety/Security |
Fire Alarm System Improvements, HNL |
AO1t25-01 |
This project will include replacing obsolete fire alarm control panels at the Ewa Concourse, Ewa Extension, Central Concourse, and Main Terminal, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices throughout the airport to meet current code requirements. |
$ 11,528,350.00 |
BIL ATP |
Sep-24 |
2025 |
3 – Major Replacement |
Replacement of SCADA System, HNL |
AO1098-21 |
This project will include upgrading the existing SCADA system to provide remote monitoring and control capabilities for the circuit breakers in all electrical vaults at HNL. |
$ 6,000,000.00 |
BIL ATP |
Sep-24 |
2025 |
3 – Major Replacement |
Terminal Spall Repairs, HNL |
AO1t20-03 |
This project will include repairs to concrete spalls and damaged expansion joints. The areas involved under this project include the Terminals 1 and 2 spaces that are not subjected to vehicular loads, exterior walls of Terminals 1 and 2, Terminals 1 and 2 parking structures, and the elevated roadway spanning between the H-1 Freeway off-ramp to the Terminal 1 facilities. |
$ 25,000,000.00 |
BIL ATP |
Apr-25 |
2025 |
3 – Major Replacement |
Vault N Replacement |
AO1t23-01 |
This project will include replacing the existing electrical Vault N at HNL, including replacement of the existing 12kV switchgear, 4.16/2.4kV H.A.C. switchgear, loadcenter unit substation, 12kV – 4.16/2.4kV, 2000kVA, 3 phase transformers, 4.16kV 208Y/120V, 300kVA, 3 phase transformer, and any associated equipment. |
$ 11,100,000.00 |
AIP Discretionary |
Aug-24 |
2026 |
1 – Safety/Security |
Runway 8-26 Rehabilitation, ITO |
AH1a24-01 |
This project will include the rehabilitation of the Runway 8-26 (9,800′ X 150′) pavement. |
$ 90,000,000.00 |
AIP Entitlement, BIL AIG |
Aug-25 |
2026 |
4 – Operational Support Facilities |
Emergency Generator Modifications |
AM1034-12 |
This project will include expansion of the existing emergency generator building and installation of a secondary emergency generator and switchgear to provide redundancy. The secondary generator will be designed to supplement the existing generator for future expansion at OGG. This project will also include replacement of the existing SCADA system. The new SCADA system will monitor and control the high and medium voltage breakers at OGG. |
$ 7,000,000.00 |
BIL ATP |
Aug-24 |
2026 |
5 – Functional Improvement |
Inbound Baggage Handling System Improvements, Phase 2, OGG |
AM1109-02 |
This project will include expansion of the existing baggage claim building and installation of a new baggage claim unit. Work will also include installation of an automated reintroduction conveyor system from the TSA Checked Baggage Resolution Area (CBRA) to a location upstream of the explosive detection system (EDS) units and replacement of existing Automatic Tag Readers (ATRs). |
$ 20,000,000.00 |
BIL ATP |
Sep-25 |
2026 |
5 – Functional Improvement |
Terminal Infrastructure Improvements, ITO |
AH1042-02 |
This project will include replacing the existing flooring within the arcade building, repairing various gutters and roof leaks throughout the terminal, repairing various termite damaged areas throughout the terminal, and addressing drainage issues at the east and west ticket lobbies. |
$ 25,000,000.00 |
BIL ATP |
Sep-25 |
2026 |
5 – Functional Improvement |
Inline Checked Baggage Belt System, LIH |
AK1t20-01 |
This project will include construction of a new inline checked baggage belt system. Improvements may include an apron level checked baggage belt system, fully integrated explosive detection systems (EDS), On Screen Resolution (OSR) operator screening room, automated tag reader, electrical room, and other related supporting improvements. |
$ 30,000,000.00 |
BIL ATP |
Sep-25 |
Harbors Projects
PROJECT NAME |
ESTIMATED
COST |
ESTIMATED
BID OPENING START DATE |
ESTIMATED DURATION (MONTHS) |
PROBABILITY |
HONOLULU HARBOR |
|
|
|
|
FY23 Pavement Repairs Various Locations at Honolulu Harbor |
$2,500,000 |
Jan-23 |
12 |
Highly |
Substructure Repairs at Various Locations |
$1,500,000 |
Jan-23 |
10 |
Highly |
Repair Pressure Relief Panels at Pier 1, Honolulu |
$200,000 |
Jun-23 |
4 |
Tentative |
Replace/Repair Aloha Tower Clock Motor, Honolulu |
$100,000 |
Jun-23 |
2 |
Tentative |
Repair Elevator at Aloha Tower, Honolulu |
$500,000 |
Jan-22 |
8 |
Tentative |
Repair Lighting and Sprinklers Pier 10, Honolulu |
$700,000 |
Jun-23 |
8 |
Tentative |
Substructure and Fender Repairs at Piers 13-14, Honolulu |
$2,000,000 |
Jan-23 |
12 |
Probable |
Repair Lift Stations at Piers 21 and 27, Honolulu |
$200,000 |
Jun-23 |
4 |
Tentative |
Revetment Repairs at Pier 23, Honolulu |
$200,000 |
Jun-23 |
3 |
Probable |
Demolish Shed at Pier 23, Honolulu |
$900,000 |
Feb-23 |
6 |
Highly |
Repair Drainline at Pier 26, Honolulu |
$100,000 |
Nov-22 |
3 |
Probable |
Bollard Repairs at Pier 39D, Honolulu |
$80,000 |
Oct-22 |
2 |
Probable |
Sheet Pile Repairs at Pier 39D, Honolulu |
$1,000,000 |
Nov-22 |
12 |
Tentative |
Replace Veeder Root System at Baseyard, Honolulu |
$100,000 |
Dec-22 |
3 |
Tentative |
Repair Electrical Panel at Pier 52, Honolulu |
$150,000 |
Oct-22 |
3 |
Probable |
Repair Fencing at Pier 53, Honolulu |
$300,000 |
Nov-22 |
6 |
Probable |
Repair Fire Alarm System at CFS Shed, Pier 53, Honolulu |
$550,000 |
Aug-23 |
5 |
Highly |
Bollard and Fender Repairs at Pier 60, Honolulu |
$200,000 |
Jun-23 |
6 |
Tentative |
New Elevator Pier 2 Passenger Terminal |
$2,200,000 |
Dec-23 |
8 |
Highly |
|
. |
|
|
|
KALAELOA BARBERS POINT HARBOR |
|
|
|
|
Repairs to Harbor Master’s Office, KBPH |
$150,000 |
Feb-23 |
6 |
Probable |
Pier 7 Shoreline Erosion, KBPH |
$200,000 |
Feb-23 |
6 |
Probable |
Repair Sewerline at Transit Shed, KBPH |
$350,000 |
Feb-23 |
6 |
Highly |
|
|
|
|
|
HILO HARBOR |
|
|
|
|
FY23 Asphalt Pavement Repairs at Hilo & Kawaihae |
$250,000 |
Mar-23 |
12 |
Highly |
Repair Guard Shack, Hilo |
$400,000 |
Sep-22 |
5 |
Tentative |
Remove Catwalk at Radio Bay, Hilo |
$100,000 |
Dec-22 |
4 |
Tentative |
Substructure Repairs at Pier 1, Hilo |
$1,000,000 |
May-23 |
12 |
Probable |
Fender Repairs at Piers 2 & 3, Hilo |
$300,000 |
May-23 |
4 |
Probable |
Repair Light Poles |
$300,000 |
May-23 |
3 |
Probable |
Replace Drain Inlet Covers at Hilo |
$100,000 |
Jan-23 |
1 |
Probable |
Provide Vehicle Barriers at Hilo & Kawaihae |
$200,000 |
Dec-22 |
1 |
Tentative |
Demo of Water Tower at Hilo Harbor |
$2,800,000 |
Jul-22 |
6 |
Probable |
Cargo Yard Expansion, Radio Bay at Hilo Harbor |
$6,000,000 |
Jun-23 |
12 |
Tentative |
|
|
|
|
|
KAWAIHAE HARBOR |
|
|
|
|
Erosion Repairs at Pier 2 Kawaihae |
$200,000 |
Dec-22 |
3 |
Probable |
New Accessway, Pavement and Lighting Improvements Kawaihae |
$8,000,000 |
Jun-23 |
10 |
Tentative |
New Maintenance Shed Improvements Kawaihae |
$2,700,000 |
Dec-22 |
6 |
Tentative |
|
|
|
|
|
KAHULUI HARBOR |
|
|
|
|
Repair Light Poles at Piers 1 & 2, Kahului |
$400,000 |
Jun-23 |
3 |
Highly |
Fence Repairs at Piers 2 & 3, Kahului |
$300,000 |
Jan-23 |
6 |
Probable |
Substructure Repairs at Pier 2, Kahului |
$600,000 |
Jun-23 |
8 |
Highly |
Fender Repairs at Kahului |
$200,000 |
Jan-23 |
4 |
Probable |
Pavement Repairs at Pier 3, Kahului |
$200,000 |
Jun-23 |
4 |
Probable |
Relocate Maintenance Baseyard Facility |
$8,800,000 |
Sep-23 |
14 |
Highly |
|
|
|
|
|
KAUNAKAKAI HARBOR |
|
|
|
|
Miscellaneous Repairs at Kaunakakai |
$300,000 |
Jun-23 |
8 |
Tentative |
Substructure Repairs at Kaunakakai |
$600,000 |
Jan-23 |
8 |
Probable |
|
|
|
|
|
|
|
|
|
|
KAUMALAPAU HARBOR |
|
|
|
|
Pavement Repairs at Kaumalapau |
$200,000 |
Jan-23 |
2 |
Tentative |
Fender Repairs at Kaumalapau |
$200,000 |
Jun-23 |
2 |
Tentative |
|
|
|
|
|
|
|
|
|
|
NAWILIWILI HARBOR |
|
|
|
|
Pavement Repairs at Nawiliwili |
$500,000 |
May-23 |
6 |
Probable |
Repair Sprinkler System at Kauai District |
$400,000 |
Mar-23 |
4 |
Probable |
Siding Repairs at Pier 2 Shed, Nawiliwili |
$350,000 |
Oct-22 |
4 |
Highly |
Light Pole Repairs at Nawiliwili |
$500,000 |
Jun-23 |
2 |
Highly |
Concrete Pavement Repairs at Pier 3 CY, Nawiliwili |
$500,000 |
Apr-23 |
4 |
Probable |
|
|
|
|
|
PORT ALLEN HARBOR |
|
|
|
|
Fender and Waterline Repairs at Port Allen |
$250,000 |
Feb-23 |
4 |
Probable |
Kauai Road & Bridge Projects
Bridge Projects in Design
- Hanalei Bridge (Route 560) – bridge rehabilitation (estimated to advertise Fall 2022) – est. cost between $1-5M
Pavement Projects in Design
- Kuhio Highway (Route 56) Kahiliholo Rd to Ka Haku Rd – asphalt resurfacing (advertised summer 2022) – est. cost between $5-10M
- Kuhio Highway (Route 56) Waikaea Bridge to Mailihuna Rd – asphalt resurfacing (estimated to advertise spring 2023) – est. cost between $1-5M
- Kuhio Highway (Route 56) Laukini Rd to Kapule Hwy – asphalt resurfacing (advertised winter 2022) – est. cost between $1-5M
- Kuhio Highway (Route 56) at Kolo Rd / Kalamania Rd – intersection improvements (estimated to advertise spring 2023) – est. cost between $5-10M
- Halewili Road (Route 540) – asphalt resurfacing (estimated to advertise spring 2023) – est. cost N/A (IDIQ)
- Waimea Canyon Drive / Kokee Road Phase 2A (Route 550) – asphalt resurfacing and shoulder improvements (advertised Fall 2022) – est. cost between $5-10M
- Kuamoo Road (Route 580) – asphalt resurfacing (estimated to advertise spring 2023) – est. cost N/A (IDIQ)
Oahu Road & Bridge Projects
Bridge Projects in Design
- Waiahole Stream Bridge (Route 83) –bridge replacement and realignment of the highway (estimated to advertise Winter 2023) – est. cost greater than $15M
- Laieloa Stream Bridge (Route 83) – bridge replacement (estimated to advertise Summer 2023) – est. cost greater than $15M
- Kaluanui Stream Bridge (Route 83) – bridge replacement and addition of pedestrian walkway (estimated to advertise Winter 2023) – est. cost greater than $15M
- Waipilopilo Stream Bridge (Route 83) – bridge replacement with pedestrian walkway (estimated to advertise fall 2023) – est. cost between $5-10M
Pavement Projects in Design
- Interstate Route H-1 (Westbound) – concrete pavement rehabilitation (estimated to advertise Fall 2023) – est. cost N/A
- Interstate Route H-2 (Northbound) – concrete pavement grinding and rehabilitation (estimated to advertise Fall 2023) – est. cost N/A
- Route H201 (Eastbound and Westbound) – ac pavement resurfacing and rehabilitation (estimated to advertise Fall 2023) – est. cost N/A
- Farrington Hwy & Kaukonohua Rd, Makalena Bridge to Weed Circle Rehabilitation (Route 930) – ac pavement resurfacing and rehabilitation (estimated to advertise Fall 2024) – est. cost between $10-15M
- Interstate Route H-1, Ola Lane to Vineyard Blvd (Eastbound) – roadway widening (advertised 3/6/2023) – est. cost greater than $15M
- Kamehameha Hwy, Laiewai Bridge to Waipuhi Bridge (Route 83) – ac pavement resurfacing and rehabilitation (estimated to advertise Spring 2023) – est. cost between $5-10M
- Kalanianaole Hwy, Kailua Road to Olomana Golf Course (Route 72) – ac pavement resurfacing and rehabilitation (estimated to advertise winter 2023) – est. cost between $10-15M
- Kalanianaole Hwy, Makapuu to Hanauma Bay Rd (Route 72) – ac pavement resurfacing and rehabilitation (estimated to advertise Winter 2023) – est. cost between $5-10M
Maui County Road & Bridge Projects
Bridge Projects in Design
- Kaaiea Stream Bridge (Route 360) – Scour repair (advertised Winter 2023) – est. cost less than $500K
- Nailiilihaele Stream Bridge (Route 360) – Scour repair (advertised winter 2023) – est. cost less than $500K
- Hana Highway Bridges (Route 360) – one bridge replacement and 5 bridge refurbishment (estimated to advertise Spring 2025) – est. cost N/A
- Honolua Stream Bridge (Route 30) – bridge refurbishment (estimated to advertise fall 2023) – est. cost between $1-5M
Pavement Projects in Design
- Puunene Avenue (Route 3500) – widening, sidewalks and existing ac pavement rehabilitation (Design-Build RFP advertised August 2022) – est. cost $15M
- Haleakala Crater Road (Route 378) – Resurfacing (Summer 2023) – est. cost between $10-15M
Hawaii County Road & Bridge Projects
Bridge Projects in Design
- Waiaka Stream Bridge (Route 19) – bridge replacement and intersection realignment (estimated to advertise summer 2023) – est. cost between $10-15M
Pavement Projects in Design
- STP-011-2(046) Volcano Road Resurfacing, Oshiro Road to Aliikoa Street – est. cost between $1-5M
- STP-0100(087)R ASPHALT PAVEMENT PRESERVATION, RESURFACING, AND RECONSTRUCTION AT VARIOUS LOCATIONS (IDIQ PAVING CONTRACT)
- Hawaii Belt Road, Rte 19 MP, 15.5-17.49
- Hawaii Belt Road, Rte 19 MP, 23.09-27.68
- Puainako Street, Rte 2000 MP 0.62-2.18
- Mamalahoa Highway, Rte 19 MP 52.1-54.45
- Volcano Road, Rte 11 MP, 3.31-6.45
- Kuakini Highway/Queen Kaahumanu Highway, Rte 11 MP, 118-121.97