ACT 049 Equipment and Motor Vehicle Report AIR (19)
Recent Posts
- H-1 Salt Lake Rehab Project scheduled in the eastbound direction July 20-21
- Completion of Mākaha Bridge No. 3 and 3A Replacement delayed to August 2024
- Farrington Highway westbound closed at Maʻipalaoa Bridge July 25 and 26
- Ramp and lane clkosures for H-201 repaving July 14 – Aug. 2
- Puʻainakō Street repaving work extended through August 2024
- Full closure of Kalaniana‘ole Highway for slope stabilization work
- Single lane closed on H-3 Kaneohe-bound after Harano Tunnel; will close fully after evening peak traffic