H-1 Freeway Westbound Lane Closure Modifications Continue This Weekend From Aiea To Pearl City

Posted on May 22, 2015 in Highways News, News

HONOLULU – The Hawaii Department of Transportation (HDOT) advises Oahu motorists that modified lane closure patterns on the H-1 Freeway westbound will be in place again this weekend to help alleviate traffic congestion during roadwork on the Pearl City Viaduct.

Three westbound right lanes will be closed between the Kaonohi Street Overpass and the Waipahu Off-Ramp (Exit 8B) starting at 8 p.m. on Saturday night, May 23, through 10 a.m. Sunday morning, May 24, for a concrete pour to widen the Pearl City Viaduct.  The lane closure will then be reduced to two right lanes from 10 a.m. to 2 p.m. and reduced again to one right lane from 2 p.m. to 6 p.m. Sunday night, during the concrete curing process.

The rightmost H-1 lane will remain open as an Exit Only lane to the Waimalu/Pearl City Off-Ramp (Exit 10), starting near the Kaahumanu Street Overpass (click here for a map).  Messageboards will be posted to notify motorists and Special Duty Police Officers will be on-site to monitor traffic.

The second exit lane connecting to the off-ramp will also be available just prior to the exit itself.  Drivers on the left side of the coned-off area should not cross through the cones to access the right exit lane.  The second exit lane will be available for these vehicles just before the exit as normal.

During the concrete curing periods, the majority of crew personnel and equipment will vacate the work site, but lanes will remain closed as the concrete hardens.  Motorists are asked to follow posted construction zone speed limits and drive slowly through the area to minimize negative vibration effects on the concrete as it hardens.

Westbound motorists are advised to plan ahead, adjust their travel times and to expect delays.  Motorists can use the GoAkamai website and mobile apps to see current traffic conditions and access images from over 200 traffic cameras on Oahu.

For more information, call the project hotline at 945-1144.  Follow HDOT on social media, and visit the Pearl City Viaduct Deck Widening and Repair project website for traffic and roadwork updates.

H1_Waimalu_Weekend_Lane_Closure_Modifcations

 

(Click image for a larger version)

The rightmost H-1 lane will remain open as an Exit Only lane to the Waimalu/Pearl City Off-Ramp (Exit 10).  Motorists will also still be able to access the second exit lane just prior to the off-ramp.

###