Page Not Found
We're sorry, we couldn't find the page you were looking for. Use the search below to find what you were looking for.
- Updated: Kamehameha Highway paving work continues on Monday, Sept. 23UPDATE 9/26/24: HONOLULU – The Hawai‘i Department of Transportation (HDOT) notifies drivers that the Kamehameha Highway Repaving at Likelike Highway will continue in Kāneʻohe across from Servco Toyota Monday, Sept. 23. Crews will be working between 8:30 a.m. and 2:30 p.m. on the following. Bold indicates the primary closure scheduled for that day. […]
- Kamehameha Highway paving work continues on Monday, Sept. 23HONOLULU – The Hawai‘i Department of Transportation (HDOT) notifies drivers that the Kamehameha Highway Repaving at Likelike Highway will continue in Kāneʻohe across from Servco Toyota Monday, Sept. 23. Crews will be working on one lane at a time, the schedule is as follows: Monday, Sept. 23 8:30 a.m. to 2:30 p.m. Left turn […]
- 16th Annual Hawaiʻi Construction Career DaysHONOLULU – The Hawaiʻi Department of Transportation is proud to announce the 16th Annual Hawai‘i Construction Career Days event. This will take place on Thursday and Friday, September 19 and 20, 2024, from 8:30 a.m. to 12:30 p.m., at the Aloha Stadium, lower Hālawa lot. Construction Career Days offers our middle and high school students […]
- Full closure of Hālona Street beginning Tuesday, Sept. 3HONOLULU – The Hawai‘i Department of Transportation (HDOT) notifies motorists of a full closure on Hālona Street starting Tuesday, Sept. 3. Hālona Street will be closed between Pālama Street and Houghtailing Street, on Tuesday, Sept. 3 through Friday, Sept. 6, from 8:30 a.m. to 3:30 p.m. for pavement repairs. As part of this […]
- Work on Magellan Avenue near Frear Street Aug. 26-30HONOLULU – The Hawai‘i Department of Transportation (HDOT) will continue emergency repairs requiring the closure of a section of city-owned Magellan Avenue between Frear Street and Miller Street Monday, Aug. 26 through Friday, Aug. 30 from 9 a.m. to 3 p.m. Vehicular traffic will be detoured around the closure. A full closure is needed to […]
- Continuous single lane closure on Kaumualiʻi Highway between Kekaha and Waimea to replace three culvertsKekaha, Hawaiʻi – The Hawaiʻi Department of Transportation (HDOT) will be closing a single lane on Kaumualiʻi Highway (Route 50) in the vicinity of Kīkīaola Boat Harbor from 8:30 a.m. Monday, Aug. 26 through December to complete permanent replacements of three 54-inch culverts. The single lane closure will be continuous and travel in both directions […]
- Full closure of Temporary Kapa‘a Bypass Road Beginning Monday Aug. 19LĪHUʻE, Hawaiʻi – The Hawai‘i Department of Transportation (HDOT) notifies the public of the full closure of the Temporary Kapa‘a Bypass Road (Route 5600) between mile post 0 to 1.0 from Kūhiō Highway to Olohena Road. The one-way southbound road will be closed Monday to Fridays, beginning, Monday, Aug. 19 through Wednesday, Oct. 2 from […]
- NIghtly Closures Of Kūhiō Highway At Hanalei Hill Now Beginning Aug. 18Revision: Due to contractor scheduling the nightly closures originally announced for Aug. 4, will now begin, Aug. 18. LĪHUʻE, Hawai‘i – The Hawai‘i Department of Transportation (HDOT) notifies motorists of nightly full closures of Kūhiō Highway between Hanalei Plantation Road and ʻŌhiki Road Sunday through Thursday from Aug.18 to Sunday, September 15. There will […]
- Intermittent Full Closure Of Kūhiō Highway In Wainiha Beginning Monday August 12LĪHUʻE, Hawaiʻi – The Hawai‘i Department of Transportation (HDOT) notifies motorists of the intermittent full closure of Kūhiō Highway (Route 560) in Wainiha near mile post 6.9, between the Wainiha Powerhouse and Hanalei Colony, Monday, August 12 through Friday, August 16. The scope of the work will include tree trimming, rock scaling and debris removal. […]
- Road Closures at Nāwiliwili Harbor Through August 9LĪHUʻE, Hawaiʻi – The Hawai‘i Department of Transportation (HDOT) notifies motorist of full road closures in Nāwiliwili. The closures are needed for paving work that is being done near the pier. The schedule is as follows. Kānoa Road: Full closure 7 a.m. to 5 p.m. Monday, July 29 Monday, August 5 Tuesday, August 6 […]