Page Not Found
We're sorry, we couldn't find the page you were looking for. Use the search below to find what you were looking for.
- Traffic will shift back to the temporary Kaipāpaʻu Bridge in Hauula on Sept. 8HONOLULU – The Hawaiʻi Department of Transportation (HDOT) is notifying Oʻahu motorists that vehicular traffic will be shifted from the old Kaipāpaʻu Bridge in Hauula back to the temporary bridge on Friday, Sept. 8, as waterline work will be completed. During the shift, pedestrian and vehicular traffic will not be impacted. The Kaipāpaʻu Bridge Replacement […]
- H-1 Freeway Salt Lake Rehabilitation Project resumes with westbound workHONOLULU – The Hawaiʻi Department of Transportation (HDOT) provides an update to Oʻahu motorists on the H-1 Freeway Salt Lake Rehabilitation Project, from the Valkenburgh Street underpass to the Salt Lake Boulevard underpass. Roadwork has been scheduled over the weekends, with up to three lanes closed on the H-1 Freeway westbound, between the stadium (Exit […]
- Full closure of Aolele Street westbound from Rogers Boulevard to the Terminal 1 Departures rampHONOLULU – The Hawaiʻi Department of Transportation (HDOT) informs Oʻahu motorists of a full closure of Aolele Street in the westbound direction between Rogers Boulevard and the up-ramp to the Terminal 1 Departures level. Roadwork is scheduled to repave Aolele Street beginning at 5 p.m. on Sunday night, Sept. 10, through 4 a.m. on Monday […]
- Update on the Pali Highway night work scheduleHONOLULU – The Hawaiʻi Department of Transportation (HDOT) reminds the public that night work will begin on the Pali Highway from Vineyard Boulevard to the Wylie Street Interchange on Sunday, Aug. 20, 2023. The roadwork dates have slightly changed to occur on Monday nights through Friday nights, from 7 p.m. to 5 a.m., weekly. Sunday […]
- Revised: Night work begins on the Pali Highway Sunday, Aug. 20HONOLULU – The Hawaiʻi Department of Transportation (HDOT) notifies the public that nighttime work will begin on the Pali Highway from Vineyard Boulevard to the Wylie Street Interchange on Sunday, Aug. 20, 2023 Aug. 13, 2023. The start date has been delayed due to equipment availability. Paving operations will occur nightly, from Sunday nights through […]
- Nighttime closure of Aolele Street scheduled on Aug. 14 and 15, for paving workHONOLULU – The Hawai’i Department of Transportation (HDOT) notifies the public that Aolele Street will be closed in both directions between the Post Office and Nimitz Highway on Monday, Aug. 14 and Tuesday, Aug. 15, from 5 p.m. to 4 a.m., for paving work. Roadwork details are as follows. During roadwork hours, motorists are advised […]
- Night work begins on the Pali Highway Sunday, Aug. 13HONOLULU – The Hawaiʻi Department of Transportation (HDOT) notifies the public that nighttime work will begin on the Pali Highway from Vineyard Boulevard to the Wylie Street Interchange on Sunday, Aug. 13, 2023. Paving operations will occur nightly, from Sunday nights through Friday mornings, from 7 p.m. to 5 a.m. Motorists can expect one to […]
- Full closure of the eastbound H-1 Freeway on-ramp from the Pali Highway on Aug. 5HONOLULU – The Hawai’i Department of Transportation (HDOT) notifies the public that the eastbound H-1 Freeway on-ramp from the Pali Highway will be closed on Saturday, Aug. 5, from 9 a.m. to 6 p.m., for paving work. Motorists wanting to access the eastbound H-1 Freeway are advised to turn left onto Vineyard Boulevard and continue […]
- Full closure of the Joint Base Pear Harbor Hickham off-ramp (Exit 15)HONOLULU – The Hawaii Department of Transportation (HDOT) is informing Oahu motorists of closures on the Joint Base Pearl Harbor Hickham off-ramp (Exit 15) from the eastbound H-1 Freeway on Sunday night, Aug. 6, through Friday, Aug. 11, from 8 p.m. to 4 a.m., nightly. Construction will also require one to two nights for a […]
- Repaving work resumes on Likelike Highway in the Kāne’ohe-bound directionHONOLULU – The Hawai’i Department of Transportation (HDOT) is notifying the public that paving work on Likelike Highway in the Kāne’ohe-bound direction will resume on Sunday night, Aug. 6. Construction will finish work in the Honolulu-bound direction before switching to the Kāne’ohe-bound lanes, closing two lanes from Nālani’ehā Street to the Wilson Tunnel. The full […]