Page Not Found
We're sorry, we couldn't find the page you were looking for. Use the search below to find what you were looking for.
- Kalanianaʻole Highway closed from Hanauma Bay Road to Sandy Beach on May 1HONOLULU– The Hawaiʻi Department of Transportation (HDOT) notifies Oʻahu motorists that Kalanianaʻole Highway will be closed in both directions between Hanauma Bay Road and Sandy Beach Park on Monday, May 1, from 8:30 a.m. to 3:30 p.m., for filming. During closure hours, highway users on Kalanianaʻole Highway will be detoured to Lunalilo Home Road, then […]
- Phase 3 of the H-1 Freeway Airport Viaduct Improvements project begins April 28HONOLULU – The Hawai‘i Department of Transportation (HDOT) notifies Oʻahu motorists that Phase 3 of the H-1 Freeway Airport Viaduct Improvements project will begin on Friday night, April 28. Two to three lanes will be closed weekly in the westbound direction between the Pearl Harbor Interchange and Ke‘ehi Interchange, Wednesday nights through Sunday nights, from […]
- Likelike Highway Reconstruction project scheduled to resume in June 2023HONOLULU– The Hawaiʻi Department of Transportation (HDOT) notifies O‘ahu motorists that the Likelike Highway Reconstruction project – from Emmeline Place to the Wilson Tunnel – is temporarily on hold due to the necessary equipment and materials being allocated instead to the Runway 8L Widening, Phase 2 project at Daniel K. Inouye International Airport. During the […]
- Eastbound lanes closed on Farrington Highway on April 10 and 11HONOLULU– The Hawaiʻi Department of Transportation (HDOT) notifies O‘ahu motorists that the eastbound lanes of Farrington Highway (Route 93) will be closed between Manunūnū Street and Maipalaoa Road on Monday and Tuesday, April 10 and 11, from 8:30 a.m. to 3 p.m., for work at Maipalaoa Bridge. A closure of the eastbound lanes is required […]
- HDOT dedicates April to Distracted Driving Awareness MonthHONOLULU – The Hawai‘i Department of Transportation (HDOT) dedicates the month of April to “Distracted Driving Awareness Month,” a national campaign urging motorists to focus solely on driving and to avoid all distractions. Distracted driving involves any activity that diverts the driver’s attention from the roadway. These actions may include but are not limited to, […]
- Improvements to accommodate bicyclists will be added to the Kalanianaole Highway and Keahole Street intersectionHONOLULU – The Hawaii Department of Transportation (HDOT) notifies motorists that improvements for bicyclists will be installed at the intersection of Kalanianaole Highway and Keahole Street, starting on Monday, April 3, 2023. Construction will install new signage, relocate loop detectors, and revise the striping format on Kalanianaole Highway and Keahole Street. Lane closure details are […]
- Nighttime full closure of the westbound Airport offramp (Exit 16) on April 3 – 6HONOLULU– The Hawaiʻi Department of Transportation (HDOT) notifies the public of a full closure of the Airport offramp (Exit 16) from the westbound H-1 Freeway on Monday night, April 3, through Thursday morning, April 6, from 8 p.m. to 3:30 a.m., nightly, for the installation of rumble bars. During closure hours, westbound motorists wanting to […]
- Full closure of Ulune Street onramp to the westbound H-1 Freeway during the week of April 3HONOLULU – The Hawaii Department of Transportation (HDOT) notifies motorists of a full closure of the Ulune Street onramp to the westbound H-1 Freeway on Monday night, April 3, through Friday morning, April 7, from 9 p.m. to 4 a.m., nightly, for lighting improvements. During closure hours, westbound motorists are advised to take Kamehameha Highway […]
- Full closure of Likelike Highway Kaneohe bound for drainage repairsHONOLULU– The Hawaiʻi Department of Transportation (HDOT) will be doing emergency drainage work requiring the full closure of the Kaneohe bound lanes of Likelike Highway from Nalanieha Street to Valley View Drive. Starting from 7 a.m. on Saturday morning, March 18, 2023, continuously through 4 a.m., Monday morning, March 20, the road will be closed, […]
- Update on the Pali Highway Resurfacing projectHONOLULU – The Hawaiʻi Department of Transportation (HDOT) provides an update on the roadwork schedule for the Pali Highway Resurfacing project, from Vineyard Boulevard to Kamehameha Highway. Due to inclement weather conditions, there has been 103 unworkable days, causing the date for substantial completion to be revised to September 2023. Remaining roadwork for the Pali […]