Page Not Found
We're sorry, we couldn't find the page you were looking for. Use the search below to find what you were looking for.
- Full closures of Farrington Highway at Mākaha Bridge No. 3 and 3A on Sept. 11HONOLULU – The Hawaiʻi Department of Transportation (HDOT) notifies motorists of upcoming full closures of Farrington Highway at Mākaha Bridge No. 3A on Wednesday, Sept. 11, from 9:30 a.m. to 10:30 a.m., for bridge deck adjustments to meet certification standards. Crews will close Farrington Highway for up to 30 minutes at a time in either […]
- Night work for restriping on Kea‘au-Pāhoa Road at Shower DriveHILO, Hawaiʻi – The Hawaiʻi Department of Transportation (HDOT) notifies motorists of a nightly, alternating single-lane closure on Kea‘au-Pāhoa Road at the intersection of Shower Drive, Monday through Friday, from 7 p.m. to 5 a.m. for striping work. Please note, this work will not take place on Monday, Sept. 2, due to the Labor Day […]
- H-3 Freeway on-ramp from Moanalua Freeway closed, evening of Sept. 5HONOLULU– The Hawaiʻi Department of Transportation (HDOT) notifies O‘ahu motorists of the upcoming full closure of the H-3 on-ramp from westbound Moanalua Freeway (Route H201) from 8 p.m., Thursday, Sept. 5, through 4 a.m., Friday, Sept. 6, for guardrail and post repairs. Motorists will be detoured through the Hālawa Interchange to access the H-3 […]
- Maʻipalaoa Bridge project extended through October 2024HONOLULU – The Hawaiʻi Department of Transportation (HDOT) updates the Māʻili community on the Maʻipalaoa Bridge project. HDOT is reevaluating the final bridge configuration to ensure the pedestrian path along the mauka side of the bridge meets standards to promote pedestrian safety. Due to this, the new estimated completion date for this project is the […]
- Phase 2 of Whitmore Avenue Sidewalk Improvements begins first week of SeptemberHONOLULU – The Hawaiʻi Department of Transportation (HDOT) begins Phase 2 of the Whitmore Avenue Sidewalk Improvements project, which will continue the accessible route created in Phase 1 to the east end of ʻIhiʻihi Avenue. Phase 1, which was completed in December 2022, created a sidewalk on the north side of Whitmore Avenue between Uakanikoʻo […]
- Maʻipalaoa Bridge Project to close westbound Farrington Highway on Tuesday, Aug. 20HONOLULU– The Hawaiʻi Department of Transportation (HDOT) updates the Māʻili community on the Maʻipalaoa Bridge project. There will be a two lane closure on westbound Farrington Highway from 9:30 a.m. to 1 p.m. on Tuesday, Aug. 20 to install the concrete and metal railings along Maʻipalaoa Bridge. The eastbound lanes of Farrington Highway will be […]
- Puainako Street repaving extended through September 2024HILO, Hawaiʻi – The Hawaiʻi Department of Transportation (HDOT) issues this update for work on the Puainako Street Resurfacing Project. Due to 77 weather-related unworkable days and construction delays, the new estimated completion date for this project is September 2024. A previous release stated the estimated completion date was August 2024. To ease impact to […]
- HDOT provides update on inner roadway repairs at Daniel K. Inouye International AirportHONOLULU — The Hawai‘i Department of Transportation (HDOT) is continuing repair work to address a hole that was found last night during a scheduled repaving of the inner roadway fronting Terminal 2 between Baggage Claims 19 to 22 at the Daniel K. Inouye International Airport (HNL). Officials estimate it may take two days to complete […]
- Traffic fatalities up 17% from July 2023HONOLULU – The Hawaiʻi State Department of Transportation (HDOT) is disappointed to report that 59 people have been killed in traffic related crashes statewide from January through July 27, 2024; a 17% increase from 49 fatalities at the same time last year. Of the 59 fatalities this year, 12 reports listed excessive speeding as the […]
- Raised crosswalk installations on Puʻainakō Street to begin August 1HILO, HAWAIʻI – The Hawaiʻi Department of Transportation (HDOT) issues this notification of night work for raised crosswalk installations as part of the Puʻainakō Street Resurfacing Project. Beginning the evening of Thursday, August 1, there will be an alternating single lane closure on Puʻainakō Street from 5 p.m. to 5 a.m. nightly, for the installation […]