Highways News

UPDATE 10/21/2024: The 24/7 closure of the Hā‘ena-bound lane of Kūhiō Highway at milepost 4.7 (Waikoko Hairpin Turn) will start today due to field observations and will continue until further notice.   LĪHUʻE, Hawaiʻi – The Hawai‘i Department of Transportation (HDOT) notifies highway users of an ongoing, single-lane closure on Kūhiō Highway (Route 560) needed ...
Read More Makai lane of Kūhiō Highway at Waikoko hairpin turn closed for slope stabilization

KAHULUI, Hawai‘i – The Hawai‘i Department of Transportation (HDOT) advises highway users that single lanes will be closed at the intersection of Puʻunēnē Avenue (Route 3500), Kūihelani Highway (Route 380), Maui Veterans Highway (Route 311) and Mayor Elmer F. Cravalho Way (Route 3800), on Tuesday, Oct. 22 and Thursday, Oct. 24, from 3 a.m. to 7 ...
Read More Closures at Kahului intersection for early morning work

Update 10/21/24: A caravan of six trucks will haul the homes from Kahului small boat ramp along Kahului Beach Road to the Lahaina site tonight, Monday, Oct. 21 and on Friday, Oct. 25, from 10 p.m. to 11:59 p.m. This is in addition to the transport on Saturday, Oct. 26 which will involve four trucks.  ...
Read More More modular homes to be transported to Lahaina

HONOLULU – The Hawai‘i Department of Transportation (HDOT) notifies motorists of the installation of a right-turn green arrow traffic signal at the intersection of Ala Moana Boulevard and Ala Moana Park Drive, which will help improve the flow of traffic from Kamake‘e Street onto Ala Moana Boulevard in the westbound direction. Turning right onto Ala ...
Read More Green arrow light installation at Ala Moana Boulevard and Ala Moana Park Drive

HONOLULU – The Hawaiʻi Department of Transportation (HDOT) notifies road users of the continuous full closure of the westbound H-1 Freeway on-ramp from Kamehameha Highway beginning at 8 p.m., Friday, Oct. 18, through 1 a.m., Monday, Oct. 21, as part of Phase 3 for the H-1 Freeway Airport Viaduct Improvements Project. A full closure is ...
Read More Full closure of westbound H-1 Airport Viaduct on-ramp from Kamehameha Highway, this weekend

LĪHUʻE – The Hawaiʻi Department of Transportation (HDOT) is providing notice of its intent to declare a traffic emergency zone on Kūhiō Highway (Route 560) at mile point 4.7 near the Waikoko hairpin turn, for emergency slope stabilization work. This notice is pursuant to Hawai‘i Revised Statutes Section 264-1.5. A traffic emergency zone declaration allows ...
Read More Traffic emergency zone hearing: Kūhiō Highway in Waikoko

HONOLULU – The Hawaiʻi Department of Transportation (HDOT) reminds everyone that installation of signs visible from state highways that do not fall under the exempted categories defined in Hawaii Revised Statutes Chapter 264, Part V is unlawful. This includes, but is not limited to, posting of political campaign signs on overpasses, fencing, signposts and poles. ...
Read More Election season reminder: Don’t post political signs along state roadways

Lane closures will be needed for secondary work beginning Sunday, Oct. 13; a full closure for expansion joint replacement will be scheduled later this month HONOLULU – The Hawai‘i Department of Transportation (HDOT) informs freeway users that paving for the H-1 Freeway Resurfacing Project, Kapi‘olani Overpass to Miller Street has been completed. The regular full ...
Read More Regular full nightly closures for H-1 resurfacing, Kapi‘olani Overpass to Miller Street, completed

KAHULUI, Hawai‘i – The Hawai‘i Department of Transportation (HDOT) advises highway users that eastbound and westbound lanes of Kaʻahumanu Avenue (Route 32) between Kāne Street and Lono Avenue will be impacted by water line work for the Maui Palms Hampton Inn project from Monday, Oct. 14 through Friday morning, Oct. 18. Nighttime full westbound closure and ...
Read More Closures on Kaʻahumanu Avenue for continued water line work

HONOLULU– The Hawaiʻi Department of Transportation (HDOT) updates the Māʻili community on the status of the Maʻipalaoa Bridge project.   HDOT is targeting its slated end of October completion date; however, this is pending the results of each concrete pour meeting specification standards for concrete strength. This date may be adjusted to allow the concrete time ...
Read More Maʻipalaoa Bridge work continues, nearing October completion date