Upcoming Transportation Projects

Safe Routes for All (proposed)
 

Below is a list of potential projects if we receive the additional $50M in state funding. 

Mamalahoa Highway Naalehu Fill in gaps in sidewalks along Mamalahoa Highway through Naalehu town (approximately Ohai Road to Kaalaiki Road) $240,000  

Kuhio Highway at Ehiku Street (Lihue) Complete sidewalk gap on Kuhio Hwy and install crosswalk across Ehiku Street near Walmart $247,000 

Ala Moana Boulevard at Ward Avenue intersection Reduce the curb radii at SE corner to reduce pedestrian crossing distance and lower vehicle speeds around right turn $260,000 

Kuhio Highway between Aku Road and Hanalei Dolphin Center Construct shared use path along Kuhio Highway through Hanalei Town Center $375,000 

Haleakala Highway, Kula Highway near Makawao Construct shared use path/sidewalk along Kula Highway and Haleakala Highway between Aapueo Parkway and Makawao Avenue $440,000 

Farrington Highway at Molokai High School Construct dedicated pedestrian facility from Kalae Highway to Molokai High School for children to walk/bike to school $465,000 

Mokulele Highway and Puunene Avenue Fill pedestrian gaps with shared use path $525,000 

Akoni Pule Highway at Kawaihae Road Realign Akoni Pule Highway to improve sight distance for drivers and pedestrians at Akoni Pule Highway and Kawaihae Harbor Road intersection; install crosswalks and advanced pedestrian warning signs $598,000 

Kuhio Highway at Kawaihau Road intersection Construct access to/from the communities along Cane Haul Road, Hauaala Road, and Kawaihau Road in Kapaa to/from the shared use path on the makai side of Kuhio Hwy $3,005,000 

Old Keaʻau-Pāhoa Rd – Shoulder Bikeway from Volcano Highway to Keaʻau-Pāhoa Road $13,262  

Volcano Highway – Shoulder Bikeway from Kanoelehua to Keaʻau-Pāhoa Road $53,580  

Bayfront Highway – Bike Lane from Pauahi Street to Waianuenue Avenue $100,977  

Fort Weaver Road (Ewa Beach) – Buffered Bike Lane from Keoneula Boulevard to Kilaha Street $139,761  

Queen Ka’ahumanu Highway – Shoulder Bikeway (signing) from Palani Road to junction Akoni Pule Highway & Kawaihae Road $148,375  

Volcano Highway (Mamalahoa Highway) – Shoulder Bikeway from Keaau-Pahoa Road to Hawaiʻi Volcanoes National Park $251,413  

Mokapu Saddle Road – Bike Lane/Buffered Kapaʻa Quarry Road to N Kalaheo Avenue $302,985  

North-South Road (Kualakaʻi Parkway) – Bike Lane from Farrington Highway to Kapolei Parkway $376,436  

Old Waiʻalae Road – Bike Lane from Waiʻalae Avenue to South King Street (over H-1) $459,068  

Airport Road – Bike Lane from Kanoelehua to Hilo Airport $464,169  

Queen Kaahumanu (ext) – Shoulder Bikeway from Kuakini Highwwy/Lako Street to Henry Street $526,398  

Kalae Highway – Shoulder Bikeway from Farrington Avenue to Palaʻau State Park $569,244  

Kea’au-Pahoa Road – Shoulder Bikeway from Paradise Drive to Kahakai Boulevard $583,527  

Fort Weaver Road – Bike Lane from Farrington Highway to Keoneula Boulevard $693,703  

Fort Weaver Road Path (Southern section) – Shared Use Path from Kilaha Street to end of public road (Puʻuloa Beach Park) $832,566  

Mokapu Saddle Road – Bike Lane/Buffered from Kāneʻohe Bay Drive to N Kalaheo Avenue $893,652  

Puʻuloa Road – Protected Bike Lane Salt Lake Boulevard to Nimitz Higway $912,015  

Vineyard Boulevard – Bike Lane from Palama Street to Punchbowl Street $1,062,997  

Kealakehe Parkway – Path from Queen Kaʻahumanu Highway to Keanalehu Drive $1,074,219  

Kamehameha Highway – Shoulder Bikeway from Koʻolau View Drive to Pali Highway $1,145,630  

Likelike Highway – Shoulder Bikeway Kahekili Highway to Kamehameha Highway $1,199,697  

Kamehameha Highway at Waiawa – New Bike Lane/Bridge from Kamehameha Highway to Kamehameha Highway $1,284,370

Puainako Street – Path from Komohana to Kilauea Street $1,443,461

Kamehameha Highway – Shoulder Bikeway from Waipio Uka Boulevard/CORP to Connector to Waipahu Street $1,552,670  

Waiaka Bridge – Shoulder Bikeway from junction Kohala Mountain Road & Kawaihae Road $1,975,012  

Wilikina Drive – Shoulder Bikeway from Kunia Road to Kamehameha Highway, Central Oʻahu $2,560,578  

Liliha Street – Bike Lane from King Street to H-1 $2,589,142  

Kuakini Highway – Shoulder Bikeway from King Kamehameha III Road to Lako Street $2,628,928  

Kāneʻohe Bay Drive – Shoulder Bikeway from Kamehameha Highway to Mokapu Saddle Road $2,830,918  

Kaumualiʻi Highway – Path (Waimea Town) from Ala Wai Road to Waimea Athletic Field $2,927,442  

Kamehameha Highway – Shoulder Bikeway from Kuahelani Avenue to Meheula Parkway $2,970,679  

Puʻunēnē Avenue – Bike Lane from Kaʻahumanu Avenue to Dairy Road $3,152,266  

Puʻuloa Road – Path from Salt Lake Boulevard to Mahiole Street $3,290,069  

Future Kealakehe Pkwy extension – Bike Lane from Kealakaa Street to Palani Road $3,292,026 

Airports Projects
 

FFY Category Project Title Project No. Project Description Estimated Project Cost Project Funding Anticipated Bid Opening Date
2022 1 – Safety/Security Perimeter Fence Replacement, KOA AH2050-09 This project includes replacement of approximately 15,880 linear feet of AOA perimeter fencing and posts along the west and north sides of runway 17-35.  This project also includes replacement of 14 AOA access gates at various locations along the AOA perimeter fence that are in need of replacement due to corrosion or damage.  A new security fence and 3 vehicle access gates will also be installed around the primary switchgear and emergency generator buildings.  $                   2,972,139.00 AIP Supplemental Discretionary Grant No.
3-15-0008-050-2022
($2,222,222)
Bids Opened 4/14/2022
2022 2 – Regulatory/ Compliance Rwy and Twy Shoulder Rehabilitation, HNL AO1021-28 This project includes reconstructing various runway and taxiway shoulders at Daniel K. Inouye International Airport. The shoulders included are: Runway 4R-22L, Runway 4L-22R, portions of Taxiway B, Taxiway C, Taxiway D, Taxiway E, Taxiway F, and Taxiway P.  The project will also remove excess pavement in order to comply with FAA design criteria for Taxiway Shoulder dimensions, and increase safety by eliminating excess pavement which may be confusing to a pilot when navigating the airfield.  Grading in the infields will also be required due to the reconstruction of the shoulders, which corrects non-confirming grades.  $               120,010,064.00 AIP Entitlement
Grant No. 3-15-0005-143-2022
($23,901,984)BIL AIG
Grant No. 3-15-0005-144-2022
($49,277,050)
Bids Opened 4/14/2022
2022 2 – Regulatory/ Compliance Repave Runway 17-35 and Taxiway E AM2021-20 This project includes pavement rehabilitation of Runway 17-35 by milling and overlaying, conducting crack repairs and seal coating to Taxiway E, improvements to Taxiway D that will connect Taxiway E to the Runway 17 end, and drainage improvements through grading and installation of trench drains and underground stormwater management devices adjacent to Runway 17-35.  $                 16,631,799.00 AIP Entitlement
Grant No. 3-15-0011-025-2022
($13,660,000)
Bids Opened 6/10/2021
2022 3 – Major Replacement Ewa & DH Concourse 2nd & 3rd Level Roadway Improvements, Phase 1, HNL AO1043-32 This project will include concrete reconstruction, expansion joint replacement, drainage improvements, lighting improvements, and other related improvements on the 2nd and 3rd level roadways fronting the Ewa and Diamond Head Concourses.  $                 24,039,621.00 BIL ATP
Grant No. 3-15-0005-146-2023
($10,000,000)
Bids Opened 11/3/2022
2022 5 – Functional Improvement Renovation of Airport Control Tower, JRF AO5024-03 This project includes various renovations to the interior spaces in the Airport Traffic Control Tower at Kalaeloa Airport.  $                   2,473,840.00 BIL FCT
($1,000,000)
Application Submitted  1/6/23
Bids Opened 11/30/2022
2023 1 – Safety/Security Taxiway and Runway Lighting Replacement (Taxiway Scope), ITO AH1021-19 This project includes the replacement of all taxiway lighting fixtures with medium intensity taxiway edge lights (MITLs) using LEDs.  A new counterpoise/lightning protection system willl be installed throughout the airfield.  $                 13,547,884.00 AIP Entitlement
Application Submitted 1/6/23
Bids Opened 6/9/2022
2023 1 – Safety/Security Fire Alarm System Improvements, KOA AH2076-13 This project will include replacing obsolete fire alarm control panels, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices to meet current code requirements throughout the Terminal and Maintenance Building.  $                   3,812,900.00 BIL ATP
Application Submitted 12/22/22
Apr-23
2023 2 – Regulatory/ Compliance Rwy and Twy Shoulder Rehabilitation, HNL AO1021-28 This project includes reconstructing various runway and taxiway shoulders at Daniel K. Inouye International Airport. The shoulders included are: Runway 4R-22L, Runway 4L-22R, portions of Taxiway B, Taxiway C, Taxiway D, Taxiway E, Taxiway F, and Taxiway P.  The project will also remove excess pavement in order to comply with FAA design criteria for Taxiway Shoulder dimensions, and increase safety by eliminating excess pavement which may be confusing to a pilot when navigating the airfield.  Grading in the infields will also be required due to the reconstruction of the shoulders, which corrects non-confirming grades.  $               120,010,064.00 AIP Entitlement Bids Opened 4/14/2022
2023 2 – Regulatory/ Compliance Drainage & Wind Cone Improvements, ITO AH1021-20 This project includes drainage improvements at the Hawaii Air National Guard Ramp, at Taxiway J, and at various locations along the vehicle service road to address ponding issues that were identified in previous Part 139 inspections.   Construction will generally consist of pavement removal, grading, turf restoration, installation of five (5) dry well structures, and management and removal of contaminated soils.  This project will also remove and replace three (3) existing windcones for Runway 8, Runway 26, and Runway 21, which are currently located within the ROFA.  $                   8,961,341.00 AIP Entitlement
Application Submitted 12/23/22
Bids Opened 1/20/2023
2023 2 – Regulatory/ Compliance Runway 3-21 RSA Improvements & Airfield Lighting Replacement (Phases 0-3), LIH AK1031-14 This project will include construction phases 0 through 3 of the Runway 3-21 RSA Improvements and Airfield Lighting Replacement.  The work will include construction of new runway and taxiway pavements for the relocation of Runway 3-21 to the west to meet FAA RSA standards.  It will also displace the threshold of Runway 21. Other work will include the construction of new taxiway pavement to extend the parallel taxiway A with a new connector to the Runway 3 end, construction of retaining walls, relocation/upgrades of navigational and visual aids, runway/taxiway lights, airfield signage, airfield markings, and replacement of the existing airfield lighting systems.  $                 77,509,325.00 BIL AIG
Application Submitted 12/23/22
Apr-23
2024 1 – Safety/Security Fire Sprinkler Upgrade, HNL AO1096-14 This project will include modernization of the existing fire sprinkler system and other fire protection devices at the HNL Overseas Terminal.  Fire protection system deficiencies and code compliance issues will be addressed.  $                 13,198,000.00 BIL ATP Jan-24
2024 1 – Safety/Security Fire Alarm System Improvements, ITO AH1t24-01 This project will include replacing obsolete fire alarm control panels, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices to meet current code requirements throughout the Terminal and Maintenance Building.  $                   2,000,000.00 CDS Earmark
Application Submitted 2/24/2023
Sep-23
2024 1 – Safety/Security Fire Alarm System Improvements, OGG AM1t24-03 This project will include replacing obsolete fire alarm control panels, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices to meet current code requirements throughout the Terminal, Maintenance Building, and ARFF Station.  $                   2,000,000.00 CDS Earmark
Application Submitted 2/24/2023
Sep-23
2024 1 – Safety/Security Taxiway and Runway Lighting Replacement (Runway Scope), ITO AH1021-19 This project includes the replacement of Runway 8-26 and Runway 3-21 edge lighting with high intesity runway edge lights (HIRLs) using LEDs.  A new counterpoise/lightning protection system will be installed throughout the airfield.  $                 12,355,916.00 AIP Entitlement Bids opened 6/9/2022
2024 1 – Safety/Security Terminal Fire Sprinkler Improvements, ITO AH1090-03 This project will include replacing all existing fire sprinkler systems such as piping replacement and modification, sprinkler head change out, relocation of valve stations,  etc.  $                   2,200,000.00 BIL ATP Apr-24
2024 2 – Regulatory/ Compliance Apron Light Replacement, OGG AS1037-12 This project will include replacement of high-pressure sodium high mast lights illuminating the passenger and cargo terminal apron, taxiway, and aircraft parking service areas at Kahului Airport (OGG) with full cut-off light (LED) fixtures to primarily minimize the impacts to seabird “fallout”.  In compliance with the Maui County Habitat Conservation Plan and HRS Section 201-8.5 Night Sky Protection strategy, this project will mitigate nighttime lighting impacts to rare, threatened, and/or endangered species.  $                 27,300,000.00 AIP Supplemental Discretionary
Application Submitted 1/27/23
May-24
2024 2 – Regulatory/ Compliance Apron Light Replacement, LNY AS1037-12 This project will include replacement of high-pressure sodium high mast lights illuminating the passenger and cargo terminal apron, taxiway, and aircraft parking service areas at Lanai Airport (LNY) with full cut-off light (LED) fixtures to primarily minimize the impacts to seabird “fallout”.  In compliance with the Maui County Habitat Conservation Plan and HRS Section 201-8.5 Night Sky Protection strategy, this project will mitigate nighttime lighting impacts to rare, threatened, and/or endangered species.  $                 11,700,000.00 AIP Supplemental Discretionary
Application Submitted 1/26/23
May-24
2024
2025
2 – Regulatory/ Compliance Runway 17-35 Rehabilitation, KOA AH2021-16 This project will include rehabilitating the entire length of Runway 17-35 (11,000′ x 150′) via a combination of pavement reconstruction, overlay, and mill and replace which will address the pavement distresses as well as bring the runway profile and cross section into compliance with FAA design criteria.  $               100,432,000.00 AIP Entitlement, BIL AIG Sep-23
2024 2 – Regulatory/ Compliance Runway 3-21 RSA Improvements & Airfield Lighting Replacement (Phase 4), LIH AK1031-14 This project will include construction phase 4 of the Runway 3-21 RSA Improvements and Airfield Lighting Replacement. The work will include Rwy 3 end pavement grooving, Rwy 3-21 pavement markings, Rwy 21 grading, flight checks, and instrument approach procedures.  $                   6,555,014.00 AIP Supplemental Discretionary
Application Submitted 1/26/23
Apr-23
2024 3 – Major Replacement Ewa & DH Concourse 2nd & 3rd Level Roadway Improvements, Phase 2, HNL AO1043-33 This project will include concrete reconstruction, expansion joint replacement, drainage improvements, lighting improvements, and other related improvements on the 2nd and 3rd level roadways fronting the Ewa and Diamond Head Concourses.  $                 75,000,000.00 BIL ATP Mar-24
2024 5 – Functional Improvement South TSA Checkpoint, OGG AM1095-10 This project will include construction of a new security screening checkpoint facility at the south end of the ticket lobby, construction of a new pedestrian bridge over the existing vehicle service road to connect the new checkpoint facility to Holdroom A, enclosure and air conditioning of the existing TSA checkpoint, and improvements to the existing Group Departure canopy adjacent to the new checkpoint.  $                 62,322,158.00 AIP Supplemental Discretionary
Application Submitted 1/26/23CDS Earmark
Application Submitted 2/24/23BIL ATP
Aug-23
2025 1 – Safety/Security Runway Rehabilitation and Airfield Utility System Improvements AO5a25-01 This project will include pavement rehabilitation for Runway 11-29, Runway 4R-22L, and Runway 4L-22R.  This project will also include replacement and upgrades to the airfield utility system, including the edge lighting, NAVAIDs, and ALCMS.  $                 17,000,000.00 BIL AIG Sep-24
2025 1 – Safety/Security Fire Alarm System Improvements, HNL AO1t25-01 This project will include replacing obsolete fire alarm control panels at the Ewa Concourse, Ewa Extension, Central Concourse, and Main Terminal, updating the central annunciator system, replacing field devices (manual stations, smoke detectors, audible and visual alarms), and installing new field devices throughout the airport to meet current code requirements.  $                 11,528,350.00 BIL ATP Sep-24
2025 3 – Major Replacement Replacement of SCADA System, HNL AO1098-21 This project will include upgrading the existing SCADA system to provide remote monitoring and control capabilities for the circuit breakers in all electrical vaults at HNL.  $                   6,000,000.00 BIL ATP Sep-24
2025 3 – Major Replacement Terminal Spall Repairs, HNL AO1t20-03 This project will include repairs to concrete spalls and damaged expansion joints.  The areas involved under this project include the Terminals 1 and 2 spaces that are not subjected to vehicular loads, exterior walls of Terminals 1 and 2, Terminals 1 and 2 parking structures, and the elevated roadway spanning between the H-1 Freeway off-ramp to the Terminal 1 facilities.  $                 25,000,000.00 BIL ATP Apr-25
2025 3 – Major Replacement Vault N Replacement AO1t23-01 This project will include replacing the existing electrical Vault N at HNL, including replacement of the existing 12kV switchgear, 4.16/2.4kV H.A.C. switchgear, loadcenter unit substation, 12kV – 4.16/2.4kV, 2000kVA, 3 phase transformers, 4.16kV 208Y/120V, 300kVA, 3 phase transformer, and any associated equipment.  $                 11,100,000.00 AIP Discretionary Aug-24
2026 1 – Safety/Security Runway 8-26 Rehabilitation, ITO AH1a24-01 This project will include the rehabilitation of the Runway 8-26 (9,800′ X 150′) pavement.  $                 90,000,000.00 AIP Entitlement, BIL AIG Aug-25
2026 4 – Operational Support Facilities Emergency Generator Modifications AM1034-12 This project will include expansion of the existing emergency generator building and installation of a secondary emergency generator and switchgear to provide redundancy.  The secondary generator will be designed to supplement the existing generator for future expansion at OGG.  This project will also include replacement of the existing SCADA system.  The new SCADA system will monitor and control the high and medium voltage breakers at OGG.  $                   7,000,000.00 BIL ATP Aug-24
2026 5 – Functional Improvement Inbound Baggage Handling System Improvements, Phase 2, OGG AM1109-02 This project will include expansion of the existing baggage claim building and installation of a new baggage claim unit.  Work will also include installation of an automated reintroduction conveyor system from the TSA Checked Baggage Resolution Area (CBRA) to a location upstream of the explosive detection system (EDS) units and replacement of existing Automatic Tag Readers (ATRs).  $                 20,000,000.00 BIL ATP Sep-25
2026 5 – Functional Improvement Terminal Infrastructure Improvements, ITO AH1042-02 This project will include replacing the existing flooring within the arcade building, repairing various gutters and roof leaks throughout the terminal, repairing various termite damaged areas throughout the terminal, and addressing drainage issues at the east and west ticket lobbies.  $                 25,000,000.00 BIL ATP Sep-25
2026 5 – Functional Improvement Inline Checked Baggage Belt System, LIH AK1t20-01 This project will include construction of a new inline checked baggage belt system.  Improvements may include an apron level checked baggage belt system, fully integrated explosive detection systems (EDS), On Screen Resolution (OSR) operator screening room, automated tag reader, electrical room, and other related supporting improvements.  $                 30,000,000.00 BIL ATP Sep-25
Harbors Projects
 

PROJECT NAME ESTIMATED
COST
ESTIMATED
BID OPENING  START DATE
ESTIMATED DURATION (MONTHS) PROBABILITY
HONOLULU HARBOR
FY23 Pavement Repairs Various Locations at Honolulu Harbor $2,500,000 Jan-23 12 Highly
Substructure Repairs at Various Locations $1,500,000 Jan-23 10 Highly
Repair Pressure Relief Panels at Pier 1, Honolulu $200,000 Jun-23 4 Tentative
Replace/Repair Aloha Tower Clock Motor, Honolulu $100,000 Jun-23 2 Tentative
Repair Elevator at Aloha Tower, Honolulu $500,000 Jan-22 8 Tentative
Repair Lighting and Sprinklers Pier 10, Honolulu $700,000 Jun-23 8 Tentative
Substructure and Fender Repairs at Piers 13-14, Honolulu $2,000,000 Jan-23 12 Probable
Repair Lift Stations at Piers 21 and 27, Honolulu $200,000 Jun-23 4 Tentative
Revetment Repairs at Pier 23, Honolulu $200,000 Jun-23 3 Probable
Demolish Shed at Pier 23, Honolulu $900,000 Feb-23 6 Highly
Repair Drainline at Pier 26, Honolulu $100,000 Nov-22 3 Probable
Bollard Repairs at Pier 39D, Honolulu $80,000 Oct-22 2 Probable
Sheet Pile Repairs at Pier 39D, Honolulu $1,000,000 Nov-22 12 Tentative
Replace Veeder Root System at Baseyard, Honolulu $100,000 Dec-22 3 Tentative
Repair Electrical Panel at Pier 52, Honolulu $150,000 Oct-22 3 Probable
Repair Fencing at Pier 53, Honolulu $300,000 Nov-22 6 Probable
Repair Fire Alarm System at CFS Shed, Pier 53, Honolulu $550,000 Aug-23 5 Highly
Bollard and Fender Repairs at Pier 60, Honolulu $200,000 Jun-23 6 Tentative
New Elevator Pier 2 Passenger Terminal $2,200,000 Dec-23 8 Highly
.
KALAELOA BARBERS POINT HARBOR
Repairs to Harbor Master’s Office, KBPH $150,000 Feb-23 6 Probable
Pier 7 Shoreline Erosion, KBPH $200,000 Feb-23 6 Probable
Repair Sewerline at Transit Shed, KBPH $350,000 Feb-23 6 Highly
HILO HARBOR
FY23 Asphalt Pavement Repairs at Hilo & Kawaihae $250,000 Mar-23 12 Highly
Repair Guard Shack, Hilo $400,000 Sep-22 5 Tentative
Remove Catwalk at Radio Bay, Hilo $100,000 Dec-22 4 Tentative
Substructure Repairs at Pier 1, Hilo $1,000,000 May-23 12 Probable
Fender Repairs at Piers 2 & 3, Hilo $300,000 May-23 4 Probable
Repair Light Poles $300,000 May-23 3 Probable
Replace Drain Inlet Covers at Hilo $100,000 Jan-23 1 Probable
Provide Vehicle Barriers at Hilo & Kawaihae $200,000 Dec-22 1 Tentative
Demo of Water Tower at Hilo Harbor $2,800,000 Jul-22 6 Probable
Cargo Yard Expansion, Radio Bay at Hilo Harbor $6,000,000 Jun-23 12 Tentative
KAWAIHAE HARBOR
Erosion Repairs at Pier 2 Kawaihae $200,000 Dec-22 3 Probable
New Accessway, Pavement and Lighting Improvements Kawaihae $8,000,000 Jun-23 10 Tentative
New Maintenance Shed Improvements Kawaihae $2,700,000 Dec-22 6 Tentative
KAHULUI HARBOR
Repair Light Poles at Piers 1 & 2, Kahului $400,000 Jun-23 3 Highly
Fence Repairs at Piers 2 & 3, Kahului $300,000 Jan-23 6 Probable
Substructure Repairs at Pier 2, Kahului $600,000 Jun-23 8 Highly
Fender Repairs at Kahului $200,000 Jan-23 4 Probable
Pavement Repairs at Pier 3, Kahului $200,000 Jun-23 4 Probable
Relocate Maintenance Baseyard Facility $8,800,000 Sep-23 14 Highly
KAUNAKAKAI HARBOR
Miscellaneous Repairs at Kaunakakai $300,000 Jun-23 8 Tentative
Substructure Repairs at Kaunakakai $600,000 Jan-23 8 Probable
KAUMALAPAU HARBOR
Pavement Repairs at Kaumalapau $200,000 Jan-23 2 Tentative
Fender Repairs at Kaumalapau $200,000 Jun-23 2 Tentative
NAWILIWILI HARBOR
Pavement Repairs at Nawiliwili $500,000 May-23 6 Probable
Repair Sprinkler System at Kauai District $400,000 Mar-23 4 Probable
Siding Repairs at Pier 2 Shed, Nawiliwili $350,000 Oct-22 4 Highly
Light Pole Repairs at Nawiliwili $500,000 Jun-23 2 Highly
Concrete Pavement Repairs at Pier 3 CY, Nawiliwili $500,000 Apr-23 4 Probable
PORT ALLEN HARBOR
Fender and Waterline Repairs at Port Allen $250,000 Feb-23 4 Probable
Kauai Road & Bridge Projects
 

Bridge Projects in Design

  1. Hanalei Bridge (Route 560) – bridge rehabilitation (estimated to advertise Fall 2022) – est. cost between $1-5M

Pavement Projects in Design

  1. Kuhio Highway (Route 56) Kahiliholo Rd to Ka Haku Rd – asphalt resurfacing (advertised summer 2022) – est. cost between $5-10M
  2. Kuhio Highway (Route 56) Waikaea Bridge to Mailihuna Rd – asphalt resurfacing (estimated to advertise spring 2023) – est. cost between $1-5M
  3. Kuhio Highway (Route 56) Laukini Rd to Kapule Hwy – asphalt resurfacing (advertised winter 2022) – est. cost between $1-5M
  4. Kuhio Highway (Route 56) at Kolo Rd / Kalamania Rd – intersection improvements (estimated to advertise spring 2023) – est. cost between $5-10M
  5. Halewili Road (Route 540) – asphalt resurfacing (estimated to advertise spring 2023) – est. cost N/A (IDIQ)
  6. Waimea Canyon Drive / Kokee Road Phase 2A (Route 550) – asphalt resurfacing and shoulder improvements (advertised Fall 2022) – est. cost between $5-10M
  7. Kuamoo Road (Route 580) – asphalt resurfacing (estimated to advertise spring 2023) – est. cost N/A (IDIQ)
Oahu Road & Bridge Projects
 

Bridge Projects in Design

  1. Waiahole Stream Bridge (Route 83) –bridge replacement and realignment of the highway  (estimated to advertise Winter 2023) – est. cost greater than $15M
  2. Laieloa Stream Bridge (Route 83) – bridge replacement  (estimated to advertise Summer 2023) – est. cost greater than $15M
  3. Kaluanui Stream Bridge (Route 83) – bridge replacement and addition of pedestrian walkway (estimated to advertise Winter 2023) – est. cost greater than $15M
  4. Waipilopilo Stream Bridge (Route 83) – bridge replacement with pedestrian walkway (estimated to advertise fall 2023) – est. cost between $5-10M

Pavement Projects in Design

  1. Interstate Route H-1 (Westbound) – concrete pavement rehabilitation  (estimated to advertise Fall 2023) – est. cost N/A
  2. Interstate Route H-2 (Northbound) – concrete pavement grinding and rehabilitation  (estimated to advertise Fall 2023) – est. cost N/A
  3. Route H201 (Eastbound and Westbound) – ac pavement resurfacing and rehabilitation  (estimated to advertise Fall 2023) – est. cost N/A
  4. Farrington Hwy & Kaukonohua Rd, Makalena Bridge to Weed Circle Rehabilitation (Route 930) – ac pavement resurfacing and rehabilitation  (estimated to advertise Fall 2024) – est. cost between $10-15M
  5. Interstate Route H-1, Ola Lane to Vineyard Blvd (Eastbound) – roadway widening  (advertised 3/6/2023) – est. cost greater than $15M
  6. Kamehameha Hwy, Laiewai Bridge to Waipuhi Bridge (Route 83) – ac pavement resurfacing and rehabilitation  (estimated to advertise Spring 2023) – est. cost between $5-10M
  7. Kalanianaole Hwy, Kailua Road to Olomana Golf Course (Route 72) – ac pavement resurfacing and rehabilitation  (estimated to advertise winter 2023) – est. cost between $10-15M
  8. Kalanianaole Hwy, Makapuu to Hanauma Bay Rd (Route 72) – ac pavement resurfacing and rehabilitation  (estimated to advertise Winter 2023) – est. cost between $5-10M
Maui County Road & Bridge Projects
 

Bridge Projects in Design

  1. Kaaiea Stream Bridge (Route 360) – Scour repair (advertised Winter 2023) – est. cost less than $500K
  2. Nailiilihaele Stream Bridge (Route 360) – Scour repair (advertised winter 2023) – est. cost less than $500K
  3. Hana Highway Bridges (Route 360)  – one bridge replacement and 5 bridge refurbishment (estimated to advertise Spring 2025) – est. cost N/A
  4. Honolua Stream Bridge (Route 30) – bridge refurbishment (estimated to advertise fall 2023) – est. cost between $1-5M

Pavement Projects in Design

  1. Puunene Avenue (Route 3500) – widening, sidewalks and existing ac pavement rehabilitation  (Design-Build RFP advertised August 2022) – est. cost $15M
  2. Haleakala Crater Road (Route 378) – Resurfacing (Summer 2023) – est. cost between $10-15M
Hawaii County Road & Bridge Projects
 

Bridge Projects in Design

  1. Waiaka Stream Bridge (Route 19) – bridge replacement and intersection realignment  (estimated to advertise summer 2023) – est. cost between $10-15M

Pavement Projects in Design

  1. STP-011-2(046) Volcano Road Resurfacing, Oshiro Road to Aliikoa Street – est. cost between $1-5M
  2. STP-0100(087)R ASPHALT PAVEMENT PRESERVATION, RESURFACING, AND RECONSTRUCTION AT VARIOUS LOCATIONS (IDIQ PAVING CONTRACT)
    • Hawaii Belt Road, Rte 19 MP, 15.5-17.49
    • Hawaii Belt Road, Rte 19 MP, 23.09-27.68
    • Puainako Street, Rte 2000 MP 0.62-2.18
    • Mamalahoa Highway, Rte 19 MP 52.1-54.45
    • Volcano Road, Rte 11 MP, 3.31-6.45
    • Kuakini Highway/Queen Kaahumanu Highway, Rte 11 MP, 118-121.97