Oahu Lane Closures
For the week of: Jan. 10 – Jan. 16
PLEASE NOTE:
Lane closure schedules may change at any time without further notice. All projects are weather permitting. A map of lane closures can be found here, https://hidot.hawaii.gov/highways/roadwork/
ADDED 1/14
2) WAIPAHU TO AIEA (NIGHT WORK)
Three lanes closed on the right-hand side of the eastbound H-1 Freeway, in the vicinity of the Naval Access Road underpass to the Waimalu off-ramp (Exit 10), from 7 p.m. to 4:30 a.m. on the evening of Thursday, Jan. 15 for work as part of the Pearl City & Waimalu Viaduct Repairs.
ADDED 1/13
3) KANEOHE
Single lane and shoulder closure on the left-hand side of Honolulu-bound H-3 Freeway, through the Harano Tunnel, from 9 a.m. to 3 p.m. on Wednesday, Jan. 14 for tunnel inspections.
— H-1 FREEWAY —
1) WAIPAHU TO AIEA (WEEKEND/NIGHT WORK)
Two to three lanes closed on the right-hand side of the eastbound H-1 Freeway, in the vicinity of the Naval Access Road underpass to the Waimalu off-ramp (Exit 10) for the Pearl City & Waimalu Viaduct Deck Repairs. Closure hours vary by day of the week and are:
- 7 p.m. Friday, Jan. 9, through 6 a.m. Saturday, Jan. 10
- 7 p.m. Saturday, Jan. 10 through 8 a.m. Sunday, Jan. 11
Note: The closure will start with two lanes closed from 7 p.m. and increase to three lanes from 8 p.m. through the duration of the closure.
ADDED 1/14/26
2) WAIPAHU TO AIEA (NIGHT WORK)
Three lanes closed on the right-hand side of the eastbound H-1 Freeway, in the vicinity of the Naval Access Road underpass to the Waimalu off-ramp (Exit 10), from 7 p.m. to 4:30 a.m. on the evening of Thursday, Jan. 15 for work as part of the Pearl City & Waimalu Viaduct Repairs.
3) PEARL CITY
Right shoulder closure on the Waipahu off-ramp (Exit 8B) from the westbound H-1 Freeway, from 7 a.m. to 2:30 p.m. on Monday, Jan. 12, through Friday, Jan. 16, for slope improvements.
4) PEARL CITY TO AIEA (NIGHT WORK)
Four lanes closed on the left-hand side of the eastbound H-1 Freeway, in the vicinity of the Waiawa Road overpass and the Kaonohi Street overpass, from 7 p.m. to 4:30 a.m. on the evening of Monday, Jan. 12 through Thursday, Jan. 15 Wednesday, Jan. 14 for work as part of the Pearl City & Waimalu Viaduct Repairs.
5) SALT LAKE TO STADIUM (WEEKEND/ NIGHT WORK)
Closure of three lanes building to four on the right-hand side of the eastbound H-1 Freeway, between the Kaimakani Street overpass and the Nimitz Highway/Airport off-ramp (Exit 15), continuously closed from 6:30 p.m. on Friday, Jan. 9 through 2 a.m. on Monday, Jan. 12 for paving work as part of the H-1 Salt Lake Rehabilitation project.
The fourth lane will be closed during the following hours:
- 7 p.m. Friday, Jan. 9 to 4:30 a.m. on Saturday, Jan. 10
- 7 p.m. Saturday, Jan. 10 to 7 a.m. on Sunday, Jan. 11
Details: https://hidot.hawaii.gov/blog/2025/12/04/h-1-salt-lake-rehabilitation-modifies-weekend-closures/
6) STADIUM TO AIRPORT VIADUCT (NIGHT WORK)
Roving single lane closure on the right-hand side of the westbound H-1 Freeway, in the vicinity of the Kaimakani Street overpass and the Nimitz Highway/Airport off-ramp (Exit 15), from 6:30 p.m. to 12 a.m. on the evening of Thursday, Jan. 15 for reinstallation of Best Management Practices (BMP) throughout the work area.
7) STADIUM TO AIRPORT VIADUCT (NIGHT WORK)
Roving single lane closure on the left-hand side of the eastbound H-1 Freeway, in the vicinity of the Kaimakani Street overpass and the Nimitz Highway/Airport off-ramp (Exit 15), from 6:30 p.m. to 12 a.m. on the evening of Thursday, Jan. 15 for reinstallation of Best Management Practices (BMP) throughout the work area.
8) AIRPORT VIADUCT TO KAHALA
Roving single lane closure on the right-hand side of the H-1 Freeway, possible in either direction, between Puuloa Road and Ainakoa Avenue, from 8 a.m. to 1 p.m. on Monday, Jan. 12, through Thursday, Jan. 15, to address pothole, litter, and sign requests.
9) HONOLULU (24-HOUR CLOSURE)
Right shoulder closure on the H-1 Freeway, in the eastbound direction, in the vicinity of the Ola Lane overpass and Richard Lane, 24-hours a day, 7-days a week as part of the H-1 Freeway Widening. For more information, visit the project website: https://h1widening.com/.
10) HONOLULU (24-HOUR CLOSURE)
Right shoulder closure on the H-1 Freeway, in the westbound direction, in the vicinity of the Likelike Highway on-ramp and the Gulick Avenue overpass, 24-hours a day, 7-days a week as part of the H-1 Freeway Widening. For more information, visit the project website: https://h1widening.com/.
11) KAIMUKI TO KAHALA (WEEKEND/NIGHT WORK)
Roving single lane closure on the left-hand side of the H-1 Freeway, between the Kapiolani Boulevard overpass and Ainakoa Avenue, from 3 a.m. to 11:30 a.m. on the morning of Saturday, Jan. 10 for tree and grass trimming, and scraping work. (i.e. removal of moss) within the median.
— H-2 FREEWAY —
1) WAIPAHU (24-HOUR CLOSURE)
Right shoulder closure on the southbound H-2 Freeway, in the vicinity of the Ka Uka Boulevard on-ramp and the Waipio Self Storage, 24-hours a day, 7-days a week for construction of access road.
— H-201 MOANALUA FREEWAY —
1)) HALAWA TO HONOLULU (NIGHT WORK)
Three lanes closed on the left-hand side of the westbound H-201 Moanalua Freeway in the vicinity of the Halawa Interchange and Richard Lane, nightly from 9 p.m. to 5 a.m. the following day on Monday Jan. 5, through Thursday, Jan. 15, for repaving as part of the H-201 Moanalua Freeway Repaving.
2) FORT SHAFTER (NIGHT WORK)
Single lane closure on the left-hand side of the eastbound H-201 Moanalua Freeway, in the vicinity of the Kikowaena Street on-ramp and the Funston Road overpass, from 9:30 p.m. to 4:30 a.m. on the evening of Monday, Jan. 12 through Thursday, Jan. 15 for concrete barrier repairs.
3) FORT SHAFTER (NIGHT WORK)
Full closure on the H-201 Moanalua Freeway off-ramp to the H-1 Freeway, in the eastbound direction, in the vicinity of the Honolulu/ King Steet off-ramp, from 9 p.m. to 4:30 a.m. on Monday, Jan. 12 through Friday, Jan. 16 as part of the H-1 Freeway Widening. For more information, visit the project website: https://h1widening.com/
— H-3 FREEWAY —
1) KANEOHE (WEEKEND/NIGHT WORK)
Single lane closure on the right-hand side of the Kaneohe-bound H-3 Freeway, between the Harano Tunnels and the Hospital Rock Tunnels, from 2 a.m. to 10:30 a.m. on the morning of Saturday, Jan. 10 for repairing of steel plate welds.
2) KANEOHE
Single lane and shoulder closure on the right-hand side of the Honolulu-bound H-3 Freeway, through the Harano Tunnel, from 9 a.m. to 3 p.m. on Monday, Jan. 12 and Wednesday, Jan. 14 for tunnel inspections.
ADDED 1/13
3) KANEOHE
Single lane and shoulder closure on the left-hand side of Honolulu-bound H-3 Freeway, through the Harano Tunnel, from 9 a.m. to 3 p.m. on Wednesday, Jan. 14 for tunnel inspections.
4) KANEOHE
Single lane and shoulder closure on the right left-hand side of the Honolulu Kaneohe-bound H-3 Freeway, through the Harano Tunnel, from 9 a.m. to 3 p.m. on Thursday, Jan. 15 for tunnel inspections.
4) KANEOHE
Single lane and shoulder closure on the left-hand side of the Kaneohe-bound H-3 Freeway, through the Harano Tunnel, from 8:30 a.m. to 2:30 p.m. on Friday, Jan. 16 for tunnel inspections.
— PALI HIGHWAY/ KALANIANAOLE HIGHWAY/ KAILUA ROAD (ROUTE 61) —
1) NUUANU
Roving single lane closure on the right-hand side of Pali Highway (Route 61) possible in either direction, in the vicinity of School Street and Waokanaka Street, from 8 a.m. to 1 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for grass trimming and litter removal.
2) NUUANU
Single lane closure on Pali Highway (Route 61) possible in either direction, in the vicinity of South Kuakini Street and Waokanaka Street, from 9 a.m. to 1:30 p.m. on Friday, Jan. 16 for crosswalk gateway and delineator maintenance.
3) NUUANU
Single lane closure on the right-hand side of Pali Highway (Route 61), in the vicinity of Waokanaka Street and Nuuanu Pali State Park, from 8 a.m. to 1 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for tree trimming and scraping work.
4) KAILUA (WEEKEND/NIGHT WORK)
Single lane closure on the right-hand side of Kailua-bound Pali Highway (Route 61) at the hairpin turn scenic point, from 4 a.m. to 7 a.m. on the morning of Saturday, Jan. 10 for electrical work. Closure may be of the left or right lane; one lane to be closed at a time.
5) KAILUA
Single lane closure on the left-hand side Kalanianaole Highway/Kailua Road (Route 61), possible in either direction, in the vicinity of Ulumanu Drive and Uluhala Street, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for traffic signals project. Potential closures of a single lane in both directions (for a total of two lanes) may be necessary.
— LIKELIKE HIGHWAY/ KALIHI STREET (ROUTE 63) —
1) KALIHI
Right lane closure on Kalihi Street (Route 63) possible in either direction between Eluwene Street and Coburn Street, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for HART civil work approaching the Dillingham Boulevard intersection. One lane to remain open at all times.
Closures for the Honolulu Authority of Rapid Transportation (HART) within HDOT jurisdiction may be found at: https://honolulutransit.org/construction/traffic-updates/
2) KALIHI (NIGHT WORK)
Single lane closure on the right-hand side of Kaneohe-bound Kalihi Street/Likelike Highway, in the vicinity of School Street and Makuahine Street, from 9 p.m. to 4 a.m. on the evening of Monday, Jan. 12 for installation of new fiber cable for Hawaiian Telcom.
3) KALIHI VALLEY
Single lane closure on Likelike Highway (Route 63) possible in either direction, in the vicinity of Nalanieha Street and the Burmeister overpass, from 9 a.m. to 1:30 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for installation of pavement markings.
— KANEOHE BAY DRIVE (ROUTE 65) —
1) KANEOHE
Right shoulder closure on eastbound Kaneohe Bay Drive (Route 65) in the vicinity of Aumoku Street and Nohonani Place from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for erosion control work.
— KALANIANAOLE HIGHWAY (ROUTE 72) —
1) KAILUA TO WAIMANALO (NIGHT WORK)
Roving single lane closure on eastbound Kalanianaole Highway (Route 72) in the vicinity of Keolu Drive and Aloiloi Street from 9 p.m. to 4 a.m. on Monday, Jan. 12 through Thursday, Jan. 15 for roving streetlight repairs.
2) KOKO HEAD TO HAWAII KAI
Single lane closure on the right-hand side of Kalanianaole Highway (Route 72) possible in either direction, in the vicinity Sandy Beach Park and Lunalilo Home Road, from 9 a.m. to 1:30 p.m. on Monday, Jan. 12 through Thursday, Jan. 15 for sign maintenance. Closure may be of the left or right lane; one lane to be closed at a time.
3) NIU VALLEY
Single lane closure on the right-hand side of Waimanalo-bound Kalanianaole Highway (Route 72) in the vicinity of Halemaumau Street and Niuiki Circle from 8:30 a.m. to 2:30 p.m. on Monday, Jan. 12 for HECO to perform electrical utility upgrades.
— JOSEPH P. LEONG/ KAMEHAMEHA HIGHWAY (ROUTE 83) —
1) HALEIWA TO KAHALUU
Roving shoulder closure on the right-hand side of Joseph P. Leong/Kamehameha Highway (Route 83), possible in either direction, in the vicinity of Weed Circle and the Kahaluu Roundabout, from 8 a.m. to 1 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for tree trimming, pothole filling and sign maintenance.
2) HALEIWA (WEEKEND/NIGHT WORK)
Roving single lane closure on Jospeh P. Leong/ Kamehameha Highway (Route 83), possible in either direction, in the vicinity of Opaeula Stream Bridge and Kapuhi Street, from 8:30 p.m. to 4 a.m. on Sunday, Jan. 11 through Thursday, Jan. 15, for repaving work toward Kahuku. One direction will be closed at a time. Details: https://hidot.hawaii.gov/blog/2025/12/11/kamehameha-highway-rehabilitation-resumes-tuesday-dec-16/
3) LAIE
Alternating single lane closure on the right-hand side of Haleiwa-bound Kamehameha Highway (Route 83) in the vicinity of Pakelo Place, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for sewer line repairs.
4) KAAAWA
Single lane closure on the right-hand side of Kaneohe-bound Kamehameha Highway (Route 83) in the vicinity of Kaawa Place and Johnson Road from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for HECO utility connection repairs.
5) KAHALUU
Single lane closure and lane shift on Kamehameha Highway (Route 83), possible in either direction, at the Kahaluu Roundabout, from 9:30 a.m. to 4:30 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for installation of Rectangular Red Flashing Beacons (RRFBs) and removal of signposts.
— KAHEKILI HIGHWAY/KAMEHAMEHA HIGHWAY (ROUTE 83) —
1) KAHALUU TO KANEOHE
Roving shoulder closure on the left- or right-hand side of Kahekili Highway/Kamehameha Highway (Route 83) possible in either direction, in the vicinity of Hui Iwa Street and Haiku Road, from 7:30 a.m. to 12:30 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for grass trimming. One lane to be closed at a time.
2) KANEOHE
Roving shoulder closure on the left- or right-hand side of Kahekili Highway (Route 83) possible in either direction, in the vicinity of Hui Iwa Street and Haiku Road, from 8:30 a.m. to 12:30 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for grass trimming and tree pruning and shoulder scraping work (i.e. removal of moss). One lane to be closed at a time.
— NIMITZ HIGHWAY/ALA MOANA BOULEVARD (ROUTE 92) —
1) AIRPORT INDUSTRIAL
Right lane closure on Nimitz Highway (Route 92) possible in either direction, in the vicinity of Valkenburgh Street and Puuloa Road, from 8:30 a.m. to 12 p.m. on Monday, Jan. 12 through Thursday, Jan. 15 for patching of spalled concrete columns.
2) HONOLULU
Single lane closure on the right-hand side of westbound Nimitz Highway (Route 92) in the vicinity of Keehi Lagoon and the Kalihi Stream Bridge, from 8:30 a.m. to 1 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for installation of fencing.
3) HONOLULU (24/7 CLOSURE)
Closures on Nimitz Highway (Route 92) between Awa Street and Richards Street on Sunday, Jan. 11, through Friday, Jan. 16, over a 24-hour period, for HART work includes:
- Awa Street closed 24/7 from Nimitz Highway, in either direction through November 2025.
- 24-hour closures of inside lanes in either direction on Nimitz Highway for installation of K-Rails. Details: https://honolulutransit.org/construction/traffic-updates/
- Nimitz Highway eastbound and westbound between Awa Street and Richards Street will have a single lane closed from 8:30 a.m. to 3 p.m., Monday, Jan. 12 through Friday, Jan. 16, in addition to the 24-hour lane closures.
- Turn restrictions from westbound Nimitz Highway onto Alakea Street, Bishop Street, and Nuuanu Street daily, from 8 a.m. to 3 p.m.
- Up to two lanes closed between Awa Street and Richards Street for striping, Monday, Jan. 12 through Friday, Jan. 16, from 8 p.m. to 5 a.m.
- Left-turn closures from eastbound Nimitz Highway (Route 92) onto Bethel Street and Nuuanu Avenue from 8 p.m. to 5 a.m. on the evening of Tuesday, Jan. 13 to support concrete pours.
Closures for the Honolulu Authority of Rapid Transportation (HART) within HDOT jurisdiction may be found at https://honolulutransit.org/construction/traffic-updates/
4) HONOLULU
Sidewalk closure on the right-hand side of westbound Ala Moana Boulevard (Route 92) in the vicinity of Ahui Street and Ward Avenue, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for installation of covered sidewalk for construction.
5) HONOLULU
Single lane closure on the right-hand side of westbound Ala Moana Boulevard (Route 92) in the right turn lane onto Ward Avenue, from 9 a.m. to 2 p.m. on Monday, Jan. 12 for fiber cable move by Spectrum.
6) HONOLULU
Two lanes closed on the left-hand side of eastbound Ala Moana Boulevard (Route 92) in the vicinity of Ala Moana Beach Park North Tennis Courts and Piikoi Street, from 7 a.m. to 10 a.m. on Wednesday, Jan. 14 through Friday, Jan. 16 for helicopter lift work.
— FARRINGTON HIGHWAY (ROUTE 93) —
1) MAKAHA TO KAPOLEI
Roving shoulder closure on the right-hand side of Farrington Highway (Route 93) possible in either direction, in the vicinity of Makua Beach and the Kalaeloa Interchange, from 8:30 a.m. to 12 p.m. on Monday, Jan. 12 through Thursday, Jan. 15 for various maintenance activities to address complaints.
2) NANAKULI TO KAPOLEI (WEEKEND/NIGHT WORK)
Two lanes closed on the left-hand side of Farrington Highway (Route 93), one in each direction, in the vicinity of Pohakunui Avenue and the Kalaeloa Interchange, from 7 p.m. to 6:15 a.m. on Sunday, Jan. 11 through Thursday, Jan. 15 for pavement reconstruction, signage and drainage relocation, and widening work. Note: The westbound lane will close at 8:30 p.m. Details: https://hidot.hawaii.gov/blog/2025/12/31/night-work-for-safety-improvements-resumes-on-farrington-highway-monday-jan-5/
— VINEYARD BOULEVARD (ROUTE 98) —
1) HONOLULU
Roving single lane closure on the right-hand side of westbound Vineyard Boulevard (Route 98), in the vicinity of Liliha Street and Aala Street, from 8 a.m. to 3 p.m. on Friday, Jan. 16 for bulky item removal.
2) HONOLULU
Single lane closure on the right-hand side of the westbound Vineyard Boulevard (Route 98) in the vicinity of Liliha Street and Liliha Shopping Center, from 8:30 a.m. to 2:30 p.m. on Wednesday, Jan. 14 for HECO to replace two utility poles fronting the shopping center.
—KAMEHAMEHA HIGHWAY (ROUTE 99)—
1) HALEIWA
Roving single lane closure on the right-hand side of Kamehameha Highway (Route 99) possible in either direction, in the vicinity of Weed Circle and Nui Avenue, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for work line grass trimming.
2) HALEIWA
Roving shoulder lane closure on the right-hand side of Kamehameha Highway (Route 99) possible in either direction, in the vicinity of Weed Circle and Nui Avenue, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Thursday, Jan. 15 for mechanical mowing.
3) AIEA TO PEARL HARBOR (WEEKEND/NIGHT WORK)
Single lane closure on eastbound Kamehameha Highway (Route 99), in the vicinity of Honomanu Street and Salt Lake Boulevard, from 9:30 p.m. to 4 a.m. on the evening of Friday, Jan. 9 for installation of pavement markings. Closure may be of the left or right lane; one lane to be closed at a time.
4) PEARL HARBOR
Single lane closure on Kamehameha Highway (Route 99) possible in either direction between Kohomua Street and Center Drive, on Monday, Jan. 12, through Friday, Jan. 16 for HART civil work. Closure times vary by direction and are scheduled as follows:
- Eastbound closures: 8:30 a.m. to 3:30 p.m.
- Westbound closures: 7 a.m. to 2:30 p.m.
One lane in each direction to remain open at all times. Closures for the Honolulu Authority of Rapid Transportation (HART) within HDOT jurisdiction may be found at https://honolulutransit.org/construction/traffic-updates/
5) KALIHI (24/7 CLOSURE)
The following closures are 24-hours a day, seven days a week, for The Rail.
- H-1 eastbound off-ramp to Dillingham Blvd. reduced to one lane.
- Middle Street southbound left turn reduced to single turn lane.
- Dillingham Boulevard eastbound between Middle Street and Marukai will have a single lane closed.
- Dillingham Boulevard westbound between GasPro and Middle Street will have a single lane closed.
Closures for the Honolulu Authority of Rapid Transportation (HART) within HDOT jurisdiction may be found at https://honolulutransit.org/construction/traffic-updates/
— KUNIA ROAD (ROUTE 750) —
1) KUNIA TO SCHOFIELD
Single lane closure on the right-hand side of Kunia Road (Route 750) possible in either direction, in the vicinity of Plantation Road and Lyman Gate, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Thursday, Jan. 15 for Bomford tree trimming work.
— FARRINGTON HIGHWAY (ROUTE 7101) —
1) KAPOLEI (WEEKEND WORK)
Roving single lane closure on Farrington Highway (Route 7101) possible in either direction, in the vicinity of Old Fort Weaver Road, from 8:30 a.m. to 11:30 a.m. on Sunday, Jan. 11 for gasline work.
2) KAPOLEI
Roving single lane closure on Farrington Highway (Route 7101) possible in either direction, in the vicinity of Old Fort Weaver Road, from 8:30 a.m. to 11:30 a.m. on Monday, Jan. 12 through Friday, Jan. 16 for gasline work.
3) EWA BEACH/WAIPAHU (24-HOUR CLOSURE)
Detour and contraflow on eastbound Farrington Highway (Route 7101) in the vicinity of Old Fort Weaver Road, on Saturday, Jan. 10, through Friday, Jan. 16, over a 24-hour period, as part of the Farrington Highway Widening project. Details: https://hidot.hawaii.gov/blog/2025/07/02/24-hour-detour-at-old-fort-weaver-road-for-farrington-highway-widening-project/
4) WAIPAHU
Roving shoulder closure on the right-hand side of Farrington Highway (Route 7101) possible in either direction, in the vicinity of Pupukahi Street and Awalau Street, from 7:30 a.m. to 12:30 p.m. for grass trimming and litter removal.
— JARRETT WHITE ROAD (ROUTE 7310) —
1) TRIPLER
Full closure and detour on northbound Jarrett White Road (Route 7310) between Ala Mahamoe Street and Apona Street, from 9 a.m. to 2:30 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for sewer line repairs. Motorists will be detoured via Ainapua Street.
— LUNALILO STREET (ROUTE 7526) —
1) HONOLULU
Single lane and on-ramp closure of westbound Lunalilo Street (Route 7526), from Keeaumoku Street, from 8:30 a.m. to 2:30 p.m. on Monday, Jan. 12 for HECO equipment replacement.
— WAIALAE AVENUE (ROUTE 7801) —
1) KAHALA
Single lane closure on the right-hand side of Waialae Avenue (Route 7801) in the vicinity of 20th Avenue and Kilauea Avenue, from 8:30 a.m. to 3 p.m. on Monday, Jan. 12 through Friday, Jan. 16 for concrete pours, backfilling footings, and seismic retrofitting work under the freeway.
— FRANKLIN D. ROOSEVELT AVENUE (ROUTE 8940) —
1) KAPOLEI
Closure of one lane at a time on Franklin D. Roosevelt Avenue (Route 8940) in either direction at the intersection of Enterprise Avenue and Fort Barrette Road, from 7:30 a.m. to 2 p.m. on Monday, Jan. 12 through Friday, Jan. 16, for installation of underground utility lines at the intersection.
— AOLELE STREET —
1) HONOLULU (NIGHT WORK)
Single lane closure and lane shift on westbound Aolele Street, fronting cargo companies, from 8 p.m. to 5 a.m., on Monday, Jan. 12 through Friday, Jan. 16 for paving work as part of HART civil work. Closures for the Honolulu Authority of Rapid Transportation (HART) within HDOT jurisdiction may be found at https://honolulutransit.org/construction/traffic-updates/
— GULICK AVENUE —
1) HONOLULU
Alternating single lane closure on Gulick Avenue, possible in either direction, in the vicinity of Pahukui Street and Beckley Street, from 8:30 a.m. to 5 p.m. on Monday, Jan. 12 through Friday, Jan. 16 as part of the H-1 Freeway Widening. Motorists will be detoured to the Kalihi Street on-ramp. For more information, visit the project website: https://h1widening.com/
2) HONOLULU (24-HOUR CLOSURE)
Full closure of intersection at Gulick Avenue and Beckley Street, 24-hours a day, seven days a week, beginning Saturday, Jan. 10 through Friday, Jan. 16, as part of the H-1 Freeway Widening. Details: https://hidot.hawaii.gov/highways/upcoming-full-closures-as-part-of-the-eastbound-h-1-freeway-improvements-project/
— RICHARD LANE —
1) HONOLULU
Alternating single lane closure on Richard Lane, possible in either direction, in the vicinity of the H-1 Freeway, from 8:30 a.m. to 5 p.m. on Monday, Jan. 12 through Friday, Jan. 16, as part of the H-1 Freeway Widening. For more information, visit the project website: https://h1widening.com/
###