Archives by Month:

Update 11/4/24: The water line work is completed for this week. There will be no lane closures in the eastbound or westbound lanes on Kaʻahumanu Avenue.  KAHULUI, Hawai‘i – The Hawai‘i Department of Transportation (HDOT) advises highway users that eastbound and westbound lanes of Kaʻahumanu Avenue (Route 32) between Kāne Street and Lono Avenue will be ...
Read More Daytime closures next week on Kaʻahumanu Avenue for water line work

Update 11/6/24: Another modular home transport is scheduled for the FEMA Kilohana project beginning at 8 p.m., Thursday, Nov. 7.  KAHULUI, Hawai‘i – The Hawai‘i Department of Transportation (HDOT) notifies highway users of potential traffic delays as modular homes for wildfire survivors are transported from Kahului to the state’s Ka Laʻi Ola housing site and the ...
Read More More modular home hauling for Lahaina temporary housing sites

LĪHUʻE, Hawaiʻi – The Hawai‘i Department of Transportation (HDOT) notifies motorists of road closures in Nāwiliwili. The closures are needed for paving work being done near the pier. The schedule is as follows:   Wilcox/ Kānoa Road: Single lane closure; traffic to be contraflowed 7 a.m. to 5 p.m.           Wednesday, Oct. 30 Wednesday, Nov. ...
Read More Road closures at Nawiliwili Harbor from Wednesday Oct. 30

HONOLULU – The Hawaiʻi Department of Transportation (HDOT) notifies road users of the continuous full closure of the westbound H-1 Freeway on-ramp from Kamehameha Highway beginning at 8 p.m., Friday, Oct. 25, through 1 a.m., Monday, Oct. 28, as part of Phase 3 for the H-1 Freeway Airport Viaduct Improvements Project.   A full closure is ...
Read More Upcoming full weekend closures of westbound H-1 Airport Viaduct on-ramps

HONOLULU– The Hawai‘i Department of Transportation (HDOT) will close the right Hale‘iwa-bound lane and shoulder on Kamehameha Highway fronting Pūpūkea Beach Park Friday, Oct. 25 from 9 p.m. to 3 a.m. to move the bus stop and add delineators as part of a safety improvement project.   The safety improvements will create a wider shoulder ...
Read More Pūpūkea shoulder improvement on Kamehameha Highway, Friday, Oct. 25

HONOLULU – The Hawai‘i Department of Transportation (HDOT) advises motorists of a single right lane and shoulder closure on the H-3 Freeway Hālawa/Honolulu-bound from the Ha‘iku-side of the Harano Tunnel to the vicinity of the runaway truck ramp on Tuesday, Oct. 29, starting at 8:30 a.m. and ending at 3 p.m. for a film production. ...
Read More Right lane and shoulder closures on H-3 Hālawa-bound for film production

Update 10/25/24: Contractor has canceled work for next week. KAHULUI, Hawai‘i – The Hawai‘i Department of Transportation (HDOT) advises highway users that eastbound and westbound lanes of Kaʻahumanu Avenue (Route 32) between Kāne Street and Lono Avenue will be impacted by water line work for the Maui Palms Hampton Inn project on Thursday, Oct. 31 and ...
Read More CANCELED: Daytime closures on Kaʻahumanu Avenue for continued water line work

LĪHUʻE, Hawaiʻi – Due to safety concerns, the Hawai‘i Department of Transportation (HDOT) will be restricting pedestrian traffic through the 24/7 single lane closure on Kūhiō Highway (Route 560) at milepost 4.7 (Waikoko Hairpin Turn). A map showing location of the closure can be found at this link. HDOT closed the makai (Hā‘ena-bound) lane  for ...
Read More Pedestrians advised to avoid Kūhiō Highway at Waikoko Hairpin Turn during slope stablization

KAHULUI, Hawai‘i – The Hawai‘i Department of Transportation (HDOT) advises highway users of single lane closures at the intersection of Honoapi‘ilani Highway (Route 30) and Kāʻanapali Parkway, from 3 a.m. to 7 a.m., Tuesday, Oct. 29, to replace a traffic signal pole. During the work, the left through lane on Honoapi‘ilani Highway in the southbound direction ...
Read More Closures at Kāʻanapali intersection for traffic signal pole replacement

HONOLULU – The Hawaiʻi Department of Transportation (HDOT) updates the Māʻili community on the status of the Maʻipalaoa Bridge project.   To allow the concrete time to set, to meet strength standard inspections and implement a redesign of the pedestrian pathway on the mauka side of the bridge, the estimated completion date has been moved to ...
Read More Upcoming closures on Farrington Highway for the Maʻipalaoa Bridge project