Kaua‘i Lane Closures
FOR THE WEEK OF NOV. 16 – NOV. 22
PLEASE NOTE:
Lane closure schedules may change at any time without further notice. All projects are weather permitting. A map of lane closures can be found here, https://hidot.hawaii.gov/highways/roadwork/
— KAUMUALII HIGHWAY (ROUTE 50) —
1) OMAO TO LAWAI
Right lane closure on Kaumualii Highway (Route 50) possible in either direction, between mile post 9 to 10, in the vicinity of Upa Road and Akemama Road, on Thursday, Nov. 21, from 8:30 a.m. to 3 p.m. for guardrail repair.
2) ELEELE
Right lane closure on Kaumualii Highway (Route 50) possible in either direction, between mile post 14 to 15, on Monday, Nov. 18 through Friday, Nov. 22, from 8:30 a.m. to 1:30 p.m. for tree trimming.
3) WAIMEA
Right lane closure on Kaumualii Highway (Route 50) possible in either direction, between mile post 22.58 to 23.06, in the vicinity of Alawai Road and Waimea Canyon Drive, on Monday, Nov. 18 through Friday, Nov. 22, from 8:30 a.m. to 1:30 p.m. for restriping of the traffic island and stop bars.
4) KEKAHA (24/7 CLOSURE)
Right lane closure on Kaumualii Highway (Route 50) possible in either direction between mile post 24.37 to 24.46, in the vicinity of Kikiaola Boat Harbor, 24 hours a day, 7 days a week, for replacement of culverts. Details: https://hidot.hawaii.gov/blog/2024/08/23/continuous-single-lane-closure-on-kaumuali%CA%BBi-highway-between-kekaha-and-waimea-to-replace-three-culverts/
— KUHIO HIGHWAY (ROUTES 56/560) —
1) PRINCEVILLE TO HANALEI
Single lane closure on Kuhio Highway (Route 560) possible in either direction, in the vicinity of Hanalei Plantation Road and Ohiki Road, on Monday, Nov. 18 through Friday, Nov. 22, from 8 a.m. to 3:30 p.m. for drain line and storm manhole installations. Alternating traffic will be routed through the open lane.
2) PRINCEVILLE TO HANALEI
Single lane closure on Kuhio Highway (Route 560) possible in either direction, in the vicinity of Hanalei Plantation Road and Papio Place, on Monday, Nov. 18 through Friday, Nov. 22, from 8:30 a.m. to 1:30 p.m. for clearing inlets, outlets and guardrails.
3) WAIKOKO (24/7 CONDITION)
Makai lane closure on Kuhio Highway (Route 560) in the Haena bound direction, in the vicinity of Waikoko Bridge and Lumahai Beach, for emergency slope stabilization. Details: https://hidot.hawaii.gov/blog/2024/10/18/makai-lane-of-kuhio-highway-at-waikoko-hairpin-turn-closed-for-slope-stabilization/#:~:text=L%C4%AAHU%CA%BBE%2C%20Hawai%CA%BBi%20%E2%80%93%20The%20Hawai’,needed%20for%20emergency%20slope%20stabilization
4) HANALEI TO WAINIHA (WEEKEND/DAILY WORK)
Single lane closure on Kuhio Highway (Route 56) possible in either direction, between mile post 4.19 to 6.36, in the vicinity of Ananalu Road on Saturday, Nov. 16 through Friday, Nov. 22, from 8:30 a.m. to 3:30 p.m. for installation of new Hawaiian Telcom poles.
— WAIMEA CANYON DRIVE (ROUTE 550) —
1) KOKEE
Single lane closure on Waimea Canyon Drive (Route 550) possible in either direction, between mile post 11.5 to 14, on Monday, Nov. 18 through Friday, Nov. 22, from 8 a.m. to 3:30 p.m. for repaving work. Alternating traffic will be routed through the open lane.
— MAALO ROAD (ROUTE 583) —
1) KAPAIA (WEEKEND WORK)
Single lane closure on Maalo Road (Route 583) possible in either direction, between mile post 3 to 3.3, on Saturday, Nov. 16, from 6:30 a.m. to 3:45 p.m. for trimming trees and cutting grass.
###