MAUI COUNTY / FEDERAL PROJECTS Special Provisions for 2005 Standard Specifications

Project Manager

SECTIONS DIVISION 100 – GENERAL PROVISIONS File Size Last Update
101 Definitions and Terms 45 KB 05/14/2021
102 Bidding Requirements and Conditions 55 KB 12/21/2022
103 Award and Execution of Contract 50 KB 09/28/2022
104 Scope of Work 39 KB 01/03/2012
105 Control of Work 44 KB 09/26/2022
106 Material Restrictions and Requirements 36 KB 10/18/2023
106A Sampling/Testing Guide for Acceptance and Verification (pdf)    Do not insert.   This is only for info for Section 106 lines 87 to 88. 499 KB 06/14/2004
106B BABA Certificate of Materials 98 KB 10/19/2023
107 Legal Relations and Responsibility to Public 31 KB 09/12/2011
108 Prosecution and Progress 115 KB 01/11/2019
108A Computation Sample for 108.09 24 KB
108B Rental Fee Amount for 108.09 – Rental Fees for Unauthorized Lane Closure or Occupancy  150 KB 03/27/2006
109 Measurement and Payment 34 KB 05/05/2014
.

DIVISION 200 – EARTHWORK

. .
203 Roadway Excavation and Embankment 19 KB 04/21/2006
209 Temporary Water Pollution, Dust, and Erosion Control  78 KB 03/04/2022

DIVISION 300 – BASES

301 Hot Mix and Asphalt Course 38 KB 07/24/2014
312 Hot Mix Glassphalt Base Course  37 KB 07/24/2014

DIVISION 400 – PAVEMENTS

401 Hot Mix Asphalt Pavement 47 KB 07/24/2014
411 Portland Cement Concrete Pavement 25 KB 03/30/2006
415 Cold Planing of Existing Pavement 25 KB 07/01/2008
.

DIVISION 600 – INCIDENTAL CONSTRUCTION

. .
602 Reinforcing Steel 21 KB 01/02/2008
603 Culverts and Storm Drain 29 KB 02/07/2012
611 Hand-Laid Riprap 25 KB 03/02/2010
613 Centerline and Reference Survey Monuments 34 KB 09/12/2011
621 Invasive Species Management 61 KB 10/15/2021
629 Pavement Markings 28 KB 03/30/2006
630 Traffic Control Guide Signs 32 KB 01/02/2014
631 Traffic Control Regulatory Warning and Miscellaneous Signs  26 KB 10/18/2012
653 Concrete Culvert Lining 45 KB 09/08/2010
655 Dumped Riprap 25 KB 03/02/2010
694 Microcomputer System 39 KB 10/10/2007
695 Cellular Phone  31 KB 10/10/2007
697 Project Vehicles  32 KB 05/01/2006
699 Mobilization 36 KB 10/03/2011
.

DIVISION 700 – MATERIALS

. .
702 Bituminous Materials
42 KB 01/03/2012
706 Concrete Clay and Plastic Pipe
45 KB 06/10/2014
712.07 Frames, Grates, Covers and Ladder Rungs 27 KB 03/30/2006
717 Cullet and Cullet-Made Material 32 KB 03/30/2006
719 Macro-Synthetic Fibers for Concrete Reinforcement 30 KB 10/04/2007
750 Traffic Control Sign and Marker Materials
32 KB 10/07/2016
755 Pavement Marking Materials
32 KB 01/30/2012

Project Manager