Oahu Lane Closures

For the week of Saturday, February 28, to Friday, March 6

PLEASE NOTE:
Lane closure schedules may change at any time without further notice. All projects are weather permitting.

— H-1 FREEWAY —

1) WAIMALU TO WAIPAHU

Right lane closure on the H-1 Freeway in the westbound direction between the Pearl City/Waimalu Off-Ramp (Exit 10) and the H-1/H-2 Split on Monday, Mar.2, through Friday, Mar. 6, from 9:30 a.m. to 2:30 p.m., for road widening.

For more information, please visit the project website at www.pmcontraflow.com or call the project hotline at (808) 945-1144.

2) PEARL CITY (WEEKEND/NIGHT WORK)

Lane closures on the H-1 Freeway in both directions at the H-1/H-2 Merge between the Waipahu Street Overpass and the Waiawa Road Overpass on Sunday night, Mar. 1, through Friday morning, Mar. 6, from 8 p.m. to 4 a.m., for the rail project.

For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.

3) SALT LAKE TO HONOLULU INTERNATIONAL AIRPORT (WEEKEND/NIGHT WORK)

Two right lanes closed on the H-1 Freeway in the westbound direction between the Keehi Interchange and the Joint Base Pearl Harbor-Hickam Off-Ramp (Exit 15B) from 9 p.m. on Friday, Feb. 27, through 12:01 a.m. on Monday morning, Mar. 2. All ramps will remain open.

Speed limits will be reduced to 15 mph in order to minimize traffic induced vibrations that may lead to cracking in the newly repaired deck.

Airport Viaduct improvements include concrete deck replacements, expansion joint repairs, and pavement restriping. Work is located between the Pearl Harbor Interchange and the Keehi Interchange.

4) PEARL CITY TO HNL AIRPORT (WEEKEND/NIGHT WORK)

Lane closures on the H-1 Freeway in the eastbound direction between the Pearlridge/Waimalu Off-Ramp (Exit 10) and the Airport Off-Ramp (Exit 16) on Sunday, Mar. 1, through Friday morning, Mar. 6, from 9 p.m. to 4:30 a.m. for pavement striping installations.

5) KALIHI (WEEKEND)

Full closure of the Palama Street Off-Ramp (Exit 20C) of the H-1 Freeway in the westbound direction on Saturday, Feb. 28, from 7:30 a.m. to 2 p.m. for street light repairs.

H-1 Freeway westbound motorists are advised to use either the School Street Off-Ramp (Exit 21A) or the Houghtailing Street Off-Ramp (Exit 20B) to access the Kalihi/Palama area.

6) WAIPAHU

Shoulder lane closed on the H-1 Freeway in the eastbound direction between the Kunia/Waipahu/Ewa Off-Ramp (Exit 5) and the H-1/H-2 Interchange on Monday, Mar. 2, through Friday, Mar. 6, from 9 a.m. to 3:30 p.m. for utility installations.

 

— H-2 FREEWAY —

1) WAIPIO (WEEKEND/NIGHT WORK)

Two right lanes closed on the H-2 Freeway in the southbound direction between the Ka Uka Boulevard Overpass and the Waianae Off-Ramp (Exit 1B) on Friday, Feb. 27, from 9 p.m. to 4 a.m. for striping and marker installations.

 

— H-3 FREEWAY —

1) HALAWA

Lane closure on the H-3 Freeway in the southbound direction after the Runaway Truck Ramp between the H-3 Tunnels and the H-1 Freeway on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m., for guardrail repairs.

 

— FARRINGTON HIGHWAY —

1) PEARL CITY

Lane closures on Farrington Highway in the westbound direction between Kamehameha Highway and Waiawa Road on Monday, Mar. 2, through Friday, Mar. 6, from 7:30 p.m. to 6 a.m. for The Rail project..

For more information, please visit the project website for The Rail at http://www.honolulutransit.org/.

2) WAIANAE

Lane closure on Farrington Highway in both directions between Guard Street and Lualualei Homestead Road, on Monday, Mar. 2, through Friday, Mar. 7, from 8:30 a.m. to 3 p.m. for waterline work.

— KAHEKILI HIGHWAY —

1) AHUIMANU

Lane closure on Kahekili Highway in the Northbound direction between Ahuimanu Place and Ahaolelo Road on Monday, Mar. 2, through Thursday, Mar. 6, from 8:30 a.m. to 3 p.m. for utility installations.

— KALANIANAOLE HIGHWAY —

1) KAILUA

Lane closure on Kalanianaole Highway in the westbound direction between Uluoa Street and Kapaa Quarry Road on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m. for guardrail repairs.

2) WAIMANALO

Shoulder lane closure on Kalanianaole Highway in the northbound direction between Keolu Drive and Ulupii Street on Monday, Mar. 2, to Friday, Mar. 6, from 8:30 a.m. to 3 p.m. for roadside pavement installations.

 

— KAMEHAMEHA HIGHWAY —

1) HALEIWA

Lane closure on Kamehameha Highway in the northbound direction between Kawailoa Drive and Weed Circle on Monday, Mar. 2, from 8:30 a.m. to 12 p.m. for utility replacements.

2) KAAAWA

Lane closure on Kamehameha Highway in the northound direction between Kina Place and Kahana Valley Road on Monday, Mar. 2 and Tuesday, Mar. 7, from 8:30 a.m. to 3 p.m. for guardrail repairs.

3) KANEOHE

Lane closure on Kamehameha Highway in the southbound direction between Halekou Road and the H-3 Freeway on Monday, Mar. 2, through Friday, Mar. 7, from 8:30 a.m. to 3 p.m., for utility installations.

4) MILILANI

Partial closures on Kamehameha Highway in northbound direction between Ka Uka Boulevard and Waihau Street on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m. for fence and guardrail installations.

Motorists are advised to expect traffic delays and use alternate roadways such as Kuahelani Avenue, Meheula Parkway, Lanikuhana Avenue, Ka Uka Boulevard and the H-2 freeway.

5) MILILANI (WEEKEND/NIGHT WORK)

24-hour shoulder lane closure on Kamehameha Highway in the northbound direction between Lanikuhana Avenue and Kipapa Street on Friday, Feb. 27, through Friday, Mar. 6, for bus pad installations.

6) MILILANI (WEEKEND/NIGHT WORK)

Full road closure on Kamehameha Highway in both directions between Ka Uka Boulevard and Lanikuhana Avenue on Sunday night, Mar. 1, through Friday morning, Mar. 6, from 8:30 p.m. to 4:30 a.m., nightly, for road reconstruction, resurfacing, and the installation of striping and markers.

General traffic will be re-routed to the H-2 Freeway, but local traffic access for Kipapa Gulch residents has been coordinated to be escorted through the project site as needed. Advisory message boards have been placed near Ka Uka Boulevard and Lanikuhana Avenue with the work schedule.

7) PUPUKEA

Lane closure on Kamehameha Highway in both directions between Iliohu Place and Wallace Beach Park on Tuesday, Mar. 3, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m., for utility repairs.

8) PEARL HARBOR

Left lane closure on Kamehameha Highway in the eastbound direction between Salt Lake Boulevard and Arizona Street on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m. for tree trimming.

9) WAIKELE

Lane closures on Kamehameha Highway in the northbound direction at the Lumiaina Street intersection on Monday, Mar. 2, through Wednesday, Mar. 4, from 8:30 a.m. to 3 p.m. as part of the Lumiaina Street Traffic Improvements project.

The Lumiaina Street Traffic Improvements project will add a dedicated left turn lane on Lumiaina Street in the eastbound direction, turning onto the northbound lanes of Kamehameha Highway towards Mililani. Traffic signals will be modified to provide a left-turn only green arrow for these lanes.  Work is anticipated to be completed in June 2015.

10) WAIKELE

Lane closure on Kamehameha Highway in the southbound direction at the Lumiaina Street intersection on Thursday, Mar. 6, through Friday, Mar. 7, from 8:30 a.m. to 3 p.m. for road maintenance.

— LIKELIKE HIGHWAY —

1) KALIHI

Right lane closure on the Likelike Highway in the northbound direction between the Wilson Tunnels and the H-3 Freeway Overpass on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m., for guardrail repairs.

 

— NIMITZ HIGHWAY —

1) SALT LAKE TO HONOLULU INTERNATIONAL AIRPORT (WEEKEND/NIGHT WORK)

Two right lanes closed on Nimitz Highway in the westbound direction between Catlin Drive and Aolele Street from 9 p.m. Friday, Feb. 27, through 12:01 a.m. Monday morning, Mar. 2, as a safety precaution due to deck repairs happening above.

2) HONOLULU

Lane closure on Nimitz Highway in the westbound direction between Kekaulike Street and Kukahi Street on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m., for utility installations.

 

— PALI HIGHWAY —

1) NUUANU

Right lane closed on the Pali Highway in both directions at the Waokanaka Street intersection on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m. for guardrail repairs.

 

— ALA MOANA BOULEVARD —

1) HONOLULU

Lane closure on Ala Moana Boulevard in the eastbound direction between Queen Street and Atkinson Drive on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m., for roadside reconstruction work.

2) HONOLULU

Right lane closed on Ala Moana Boulevard in the eastbound direction between Kahanamoku Street and Kalakaua Avenue on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m., for sewage maintenance.

 

— VINEYARD BOULEVARD —

1) HONOLULU

Roving lane closures on Vineyard Boulevard in the eastbound direction between Palama Street and the Pali Highway on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 4:30 p.m., daily, for striping, loop detector work and fence installations.

The Vineyard Boulevard Resurfacing Project will resurface 10.5 lane miles from Palama Street to the H-1 Freeway On-Ramp. The repairs include sidewalks, curbs, gutters, installing bus pads, replacing existing traffic signal heads, energy-efficient, LED optical units, extending left turn lanes at the Palama Street and Liliha Street intersections, and landscaping.

2) HONOLULU

Roving lane closures on Vineyard Boulevard in the westbound direction between the Vineyard Boulevard Off-Ramp (Exit 22) and Halona Street on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 4:30 p.m., for repaving work.

 

— LUMIAINA STREET —

1) WAIKELE

Lane closures on Lumiaina Street in the eastbound direction at the Kamehameha Highway intersection on Monday, Mar. 2, through Friday, Mar. 7, from 8:30 a.m. to 3 p.m., for road reconstruction.

This work is a part of the Lumiaina Street Traffic Improvements project. Construction will add a dedicated left turn lane on Lumiaina Street in the eastbound direction, turning onto the northbound lanes of Kamehameha Highway towards Mililani. Traffic signals will be modified to provide a left-turn only green arrow for these lanes.  Work is anticipated to be completed in June 2015.

2) WAIKELE

Lane closures on Lumiaina Street in the westbound direction at the Kamehameha Highway intersection on Thursday, Mar. 6, through Friday, Mar. 7, from 8:30 a.m. to 3 p.m., for road reconstruction.

 

— KAILUA ROAD —

1) KAILUA

Right lane closure on Kailua Road in both directions between Hamakua Drive and Uluhala Street on Monday, Mar. 2, through Friday, Mar. 6, from 8:30 a.m. to 3 p.m., for guardrail repairs.

 

— KUNIA ROAD —

1) VILLAGE PARK

Right lane closure on Kunia Road in the southbound direction between Plantation Road and Kupuna Loop on Friday, Feb. 27, from 8:30 a.m. to 2:30 p.m. for utility installations.