20230311 Likelike drainage repairs
![pipe removal](https://hidot.hawaii.gov/highways/files/2023/03/pipe-removal-225x300.jpg)
View of the drainage trench after the metal pipe had been removed.
![shoring trench](https://hidot.hawaii.gov/highways/files/2023/03/shoring-225x300.jpg)
The trench being shored so it is safe for contractors to work in the trench.
![Adding fill](https://hidot.hawaii.gov/highways/files/2023/03/fill-225x300.jpg)
Adding fill to the trench.
![concrete pipe](https://hidot.hawaii.gov/highways/files/2023/03/pipe-setting-225x300.jpg)
First section of concrete pipe being placed.
![tying rebar for collar](https://hidot.hawaii.gov/highways/files/2023/03/collar-rebar-225x300.jpg)
Tying rebar to hold the pipe collar in place.
![pipe being set](https://hidot.hawaii.gov/highways/files/2023/03/pipe-setting-2-225x300.jpg)
Final pipe section being set.
![collar pour](https://hidot.hawaii.gov/highways/files/2023/03/collar-pour-300x225.jpg)
Drainage pipe collar being poured.
![collar pour](https://hidot.hawaii.gov/highways/files/2023/03/collar-pour-2-169x300.jpg)
Another view of the collar pour.
![backfill](https://hidot.hawaii.gov/highways/files/2023/03/backfill-225x300.jpg)
Backfill begins.
![backfill](https://hidot.hawaii.gov/highways/files/2023/03/backfill-2-225x300.jpg)
Backfill continues.
![tamping down backfill](https://hidot.hawaii.gov/highways/files/2023/03/backfill-3-225x300.jpg)
Backfill being prepared for paving.