DOT / FEDERAL PROJECTS Special Provisions for 2005 Standard Specifications
205Excavation and Backfill for Bridge and Retaining Structures 18 KB07/01/2018206Excavation and Backfill for Drainage Facilities 5 KB07/01/2018
SECTIONS | DIVISION 100 – GENERAL PROVISIONS |
File Size |
Last Update |
101 | Terms, Abbreviations, and Definitions. | 42 KB | 05/06/2021 |
102 | Bidding Requirements and Conditions | 94 KB | 12/21/2022 |
103 | Award and Execution of Contract | 31 KB | 08/19/2022 |
104 | Scope of Work | 39 KB | 01/03/2012 |
105 | Control of Work | 40 KB | 09/26/2022 |
106 | Material Restrictions and Requirements | 33 KB | 10/18/2023 |
106A | Sampling/Testing Guide for Acceptance and Verification (pdf) Do not insert. This is only for info for Section 106 lines 87 to 88. | 499 KB | 06/14/2004 |
106B | BABA Certificate of Materials | 94 KB | 10/19/2023 |
107 | Legal Relations and Responsibility to Public | 56 KB | 05/05/2014 |
108 | Prosecution and Progress | 127 KB | 06/05/2020 |
108A | Computation Sample for 108.08 – Liquidated Damages for Failure to Complete the Work or Portions of the Work on Time | 24 KB | 03/27/2006 |
108B | Rental Fee Amount for 108.09 – Rental Fees for Unauthorized Lane Closure or Occupancy | 150 KB | 03/27/2006 |
109A | Measurement and Payment | 34 KB | 05/05/2014 |
DIVISION 200 – EARTHWORK |
|||
201 | Clearing and Grubbing | 25 KB | 07/01/2018 |
202 | Removal of Structures and Obstructions | 7 KB | 07/01/2018 |
203 | Roadway Excavation and Embankment | 15 KB | 07/01/2018 |
204 | Excavation and Backfill for Miscellaneous Facilities | 6 KB | 07/01/2018 |
206 | Excavation and Backfill for Drainage Facilities | 28 KB | 11/01/2018 |
207 | Ditch and Channel Excavation | 21 KB | 07/01/2018 |
209 | Temporary Water Pollution, Dust, and Erosion Control | 79 KB | 01/14/2022 |
DIVISION 300 – BASES |
|||
301 | Hot Mix and Asphalt Course | 38 KB | 07/24/2014 |
304 | Aggregate Base Course | 6 KB | 07/01/2018 |
305 | Aggregate Subbase Course | 6 KB | 07/01/2018 |
312 | Hot Mix Glassphalt Base Course | 37 KB | 07/24/2014 |
314 | Controlled Low Strength Material for Utilities and Structures | 6 KB | 06/01/2018 |
DIVISION 400 – PAVEMENTS |
|||
401 | Hot Mix Asphalt Pavement | 47 KB | 07/24/2014 |
411 | Portland Cement Concrete Pavement | 21 KB | 08/20/2020 |
415 | Cold Planing of Existing Pavement | 25 KB | 07/01/2008 |
DIVISION 500 – STRUCTURES |
|||
501 | Steel Structures | 29 KB | 07/01/2018 |
502 | Timber Structures | 52 KB | 10/09/2020 |
503 | Concrete Structures | 22 KB | 07/01/2018 |
504 | Prestressed Concrete Members | 20 KB | 07/01/2018 |
507 | Railing | 19 KB | 07/01/2018 |
508 | Cement Rubble Masonry | 19 KB | 07/01/2018 |
DIVISION 600 – INCIDENTAL CONSTRUCTION |
|||
601 | Structural Concrete | 116 KB | 07/10/2020 |
602 | Reinforcing Steel | 22 KB | 07/01/2018 |
603 | Culverts and Storm Drain | 10 KB | 07/01/2018 |
605 | Underdrains | 25 KB | 07/01/2018 |
606 | guardrail | 7 KB | 07/01/2018 |
607 | Chain Link Fences and Gates | 6 KB | 07/01/2018 |
610 | Reinforced Concrete Driveways | 6 KB | 07/01/2018 |
611 | Hand-Laid Riprap | 22 KB | 07/01/2018 |
612 | Grouted Rubble Paving | 5 KB | 07/01/2018 |
613 | Centerline and Reference Survey Monuments | 9 KB | 07/01/2018 |
614 | Street Survey Monuments | 7 KB | 07/01/2018 |
619 | Planting | 31 KB | 04/18/2016 |
621 | Invasive Species Management | 61 KB | 10/15/2021 |
622 | Roadway and Sign Lighting System | 8 KB | 07/01/2018 |
623 | Traffic Signal System | 20 KB | 07/01/2018 |
626 | Manholes and Valve Boxes for Water and Sewer System | 6 KB | 07/01/2018 |
628 | Shotcrete | 6 KB | 07/01/2018 |
629 | Pavement Markings | 20 KB | 07/01/2018 |
630 | Traffic Control Guide Signs | 11 KB | 07/01/2018 |
631 | Traffic Control Regulator Warning and Miscellaneous Signs |
8 KB | 07/01/2018 |
632 | Markers | 6 KB | 07/01/2018 |
634 | Portland Cement Concrete Sidewalks | 6 KB | 07/01/2018 |
635 | HMA Sidewalks | 6 KB | 07/01/2018 |
636 | E-Construction | 38 KB | 05/05/2022 |
637 | Slotted Drains | 5 KB | 07/01/2018 |
638 | Portland Cement Concrete Curb and Gutter | 8 KB | 07/01/2018 |
639 | Asphalt Concrete Curb and Gutter | 6 KB | 07/01/2018 |
640 | Lined Drainage Ditch and Concrete Spillways |
21 KB | 07/01/2018 |
641 | Hydro-Mulch Seeding |
31 KB | 02/27/2014 |
650 | Curb Ramps | 6 KB | 07/01/2018 |
653 | Concrete Culvert Lining | 45 KB | 09/08/2010 |
654 | Restrainers | 21 KB | 07/01/2018 |
655 | Dumped Riprap | 6 KB | 07/01/2018 |
697 | Project Web Page | 37 KB | 07/01/2008 |
699 | Mobilization | 36 KB | 10/03/2011 |
DIVISION 700 – MATERIALS |
|||
702 | Bituminous Materials |
42 KB | 01/03/2012 |
703 | Aggregates |
212 KB | 04/10/2013 |
706 | Concrete Clay and Plastic Pipe |
45 KB | 06/10/2014 |
712.07 | Frames, Grates, Covers and Ladder Rungs | 27 KB | 03/30/2006 |
714 | Structural Timber and Related Materials | 35 KB | 10/09/2020 |
717 | Cullet and Cullet-Made Material | 32 KB | 03/30/2006 |
719 | Macro-Synthetic Fibers for Concrete Reinforcement | 30 KB | 10/04/2007 |
750 | Traffic Control Sign and Marker Materials |
32 KB | 10/07/2016 |
755 | Pavement Marking Materials |
32 KB | 01/30/2012 |